Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Yellow Fox Antimony Project Update

In This Article:

Thunder Bay, Ontario--(Newsfile Corp. - March 12, 2025) - Metals Creek Resources Corp. (TSXV: MEK) (FSE: M1C1) (the "Company" or Metals Creek) is pleased to announce that the Company has been advised by its option partner Lomiko Metals Inc. (Lomiko or TSX-V: LMR) of an update on the Yellow Fox, antimony, silver, and gold property acquired from Metals Creek as per news release issued on January 21st, 2025. (See MEK news release dated January 21 2025).

The Yellow Fox property is on the same trend as the past-producing Beaver Brook antimony mine, which is located 25km southwest of the property. Yellow Fox is an early-stage exploration property prospective in antimony, gold, and silver where historic works returned samples anomalous in gold (Au), antimony (Sb), lead (Pb), zinc (Zn), and silver (Ag). The trenching exposed the rocks, resulting in grab samples to 59.43g/t Au, 11.10% Sb, 7.00% Zn, 72.90g/t Ag, and 5.50% Pb in arsenopyrite-stibnite veins within altered monzogranite. (See Metals Creek assessment report at https://gis.geosurv.gov.nl.ca/geofilePDFS/Batch2016/002D_0779.pdf).

Alexander (Sandy) Stares, President, CEO and a director of Metals Creek States, "We are pleased to see Lomiko moving ahead and execute a plan to further evaluate the potential at the prospective Yellow Fox property. This allows Metals Creek to remain focused on the Tillex Copper Project and the Ogden Gold Project in Timmins Ontario while the Yellow Fox Project moves forward."

Gordana Slepcev, CEO, President, and Director of Lomiko, stated: "We are pleased to move forward with the Phase 1 work program at the Yellow Fox property with a targeted soil sampling program to take place in the spring. The plan is to complete 10 lines at 250 meters spacing and collect approximately 700 soil samples to better define existing highly prospective antimony and silver and gold targets as well as further evaluate south of the Yellow Fox showing where little to no work has been performed historically. We are happy to be working with Metals Creek, who will manage and complete the work program for Lomiko."

Yellow Fox antimony and gold prospect Spring 2025 Work Program

Lomiko reviewed existing data and devised a plan for the fieldwork program in the spring of 2025.

Phase 1 of the plan in the spring is focused on soil sampling with the following highlights:

  • Soil sampling program targeted south of Yellow Fox, showing 59.413 g/t gold and areas of increased density of interpreted structures, See Figure 1.

  • Approximately 700 soil samples on ten 250m spaced lines trending approximately 110 degrees with samples taken every 25m along the line.

  • Should the soil sampling program be proven effective, expansion of the lines and additional lines to the south are warranted, which would be the focus of the Phase 2 program.

  • Phase 2 will see the soil sampling completed on the 250-meter parallel grids at 25-meter spacing covering the southern end of the property.

  • Phase 2 will also focus on ground truthing existing targets as well as following up on newly generated targets

  • Depending on the results of the phase 1 testing, a targeted EM survey will be undertaken.