Unlock stock picks and a broker-level newsfeed that powers Wall Street.
World Copper Files Amended Resource Estimate and Technical Report for Updated Resource Estimate for the Zonia Project

In This Article:

Provides ATM Quarterly Report

This news release constitutes a "designated news release" for the purposes of the Company's prospectus supplement dated July 17, 2024 to its short form base shelf prospectus and amended and restated short form base shelf prospectus dated June 7, 2024

Vancouver, British Columbia--(Newsfile Corp. - November 12, 2024) - World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE:7LY0) ("World Copper" or the "Company") announces an amended mineral resource estimate (the "Amended Resource Estimate") for the Zonia copper-oxide deposit in Arizona, USA ("Zonia" or the "Project"), and has filed an amended copy of its National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") technical report on SEDAR+. A calculation error in the block model used in the resource estimate necessitated a restating of the estimate.

The amended NI 43-101 technical report is entitled "Resource Estimate for The Zonia Project 2024 Update" (the "Technical Report") and is dated November 8, 2024 and dated effective August 27, 2024. The Technical Report was prepared pursuant to NI 43-101 by Sue Bird, P.Eng., of Moose Mountain Technical Services ("MMTS"), an independent qualified person as defined by NI 43-101 (the "QP"). The Technical Report is available on World Copper's SEDAR+ profile at www.sedarplus.ca and is available on World Copper's website at www.worldcopperltd.com.

Amended Resource Estimate for Zonia

The amended resource estimate contains Indicated Resources of 112.2 million short tons grading 0.297% total-copper (TCu) containing 668 million pounds of copper, and Inferred Resources of 62.9 million short tons grading 0.255 % total-copper containing 320 million pounds of copper. These numbers differ slightly from those in the October 25, 2024 news release https://worldcopperltd.com/2024/10/25/world-copper-files-technical-report-for-updated-resource-estimate-for-the-zonia-project/ , with nominal increases (3%) to tonnage and total contained copper, and a small decrease (0.5%) in grade for only the Indicated class.

The classified resources are outlined in detail in Table 1 at the base case cut-off grade of 0.18% and at a range of cut-off grades in Table 2. The Resource Estimate was completed for World Copper as part of the Company's overall exploration plan for Zonia (see news release dated May 22, 2022).

Table 1. Zonia Mineral Resource Estimate at the Base Case Cutoff Grade

Classification (Oxidation State)

Copper Cut-off grade (%)

Short Tons (Million)

Grade (TCu%)

Cu Lbs. (Million)

Indicated (Oxide)

0.18

101.2

0.300

608

Indicated (Mixed)

0.18

11.0

0.271

60

Total Indicated

0.18

112.2

0.297

668

Inferred (Oxide)

0.18

46.4

0.257

239

Inferred (Mixed)

0.18

16.5

0.248

82

Total Inferred

0.18

62.9

0.255

320