West Point Gold Intersects 42.8m of 2.50 g/t Au, including 11.7m of 5.94 g/t Au at Tyro Main Zone, Gold Chain Project, Arizona

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - January 23, 2025) - West Point Gold Corp. (TSXV: WPG) (OTCQB: WPGCF) ("West Point Gold" or the "Company") is pleased to announce additional drill results from its recently completed 1,264m (8 hole) diamond drill campaign focused on the Tyro Main Zone, at its Gold Chain Project in Arizona.

Highlights:

  • Hole GC24-34 intersected 42.80m of 2.50 g/t Au, including 11.70m of 5.94 g/t Au, returning mineralization from surface. Hole GC24-34 is located approximately 700 metres northeast along the Tyro Main Zone structure from GC23-28 (link).

  • Hole GC24-32 intersected a hanging wall zone of mineralization for 6.94m of 4.3 g/t Au including 1.44m of 15.24 g/t Au from 16.31m.

  • Hole GC24-32 intersected a footwall wall zone of 16.08m of 1.35 g/t Au from 49.07m. Infill sampling of approximately 24 metres is underway.

  • The Company believes that these results are consistent with previous estimates of size potential at the Tyro Main Zone.

  • Infill sampling on holes GC24-30, GC24-31, and GC24-32 have the potential to increase the width of the Tyro Main zone.

  • The Company is preparing for the next phase of drilling at Tyro, expected to start in February 2025.

"We are excited by the material increase in grade and width at the north end of the Tyro Main Zone as evidenced by hole GC24-34 and plan to place additional focus on this area during the upcoming drill program," stated CEO, Quentin Mai. "As the correlation of mineralization between hanging wall and footwall improves, we anticipate the additional samples sent to the lab around the hanging wall could expand the mineralized zone."

Figure 1: Preliminary Tyro Main Zone Long Section showing results from 2024 DDH program along with RC drilling, trenches and 200 Level Sampling

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/5717/238121_11f16d97544b3b0e_004full.jpg

Table 1: Drill Results

Holes

From (m)

To (m)

Width (m)

Grade (g/t Au)

GC24-29

0.00

16.15

16.15

0.56

incl.

12.19

16.15

3.96

1.84

and

99.97

118.50

18.53

0.26

and

158.05

165.51

7.46

0.98

GC24-32

16.31

23.25

6.94

4.34

incl.

16.31

17.75

1.44

15.24

and

30.90

33.00

2.10

3.19

and

49.07

65.15

16.08

1.35

incl.

57.25

60.50

3.25

3.10

GC24-33

77.30

77.95

0.65

0.54

GC24-34

0.00

42.80

42.80

2.50

incl.

24.20

35.90

11.70

5.94

GC24-35

0.00

9.10

5.93

2.79

and

113.54

124.40

10.86

0.21

and

140.21

168.20

27.99

0.89

incl.

154.50

168.20

13.70

1.58

 

Notes:

  • Hole GC24-36 returned no significant assays.

  • All widths shown are down hole; true width is approximately 80% of down hole width, except Hole GC24-29 where true width is unknown.

  • Hole GC24-32 – Infill sampling is underway, assays are pending between 23.25 to 29.72m and 33.0 to 49.07m.