Unlock stock picks and a broker-level newsfeed that powers Wall Street.

West Point Gold Intersects 22.86m of 3.34 g/t Au and 28.95m of 1.92 g/t Au at Gold Chain Project, Arizona

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - April 16, 2025) - West Point Gold Corp. (TSXV: WPG) (OTCQB: WPGCF) (FSE: LRA0) ("West Point Gold" or the "Company") is pleased to announce the most recent drill results from its ongoing drill program at the Tyro Main Zone, Gold Chain Project, Arizona. This release contains the assays for five reverse circulation drill holes GC25-42 to GC25-46, totalling 757.4m.

Highlights:

  • Hole GC25-43 intersected 22.86m of 3.34 g/t Au, including 3.04m of 16.01 g/t Au.

  • Hole GC25-42 intersected 28.95m of 1.92 g/t Au, including 1.52m of 5.22 g/t Au and including 4.57m of 3.65 g/t Au.

  • Holes GC25-45 and GC25-46, the two northernmost holes testing the Tyro Main Zone, intersected weak mineralization without significant gold intercepts, it is hypothesized that gold grades should improve at depth keeping the zone open to the northwest.

  • Tyro Main Zone remains open at depth, northeast towards Frisco Graben, and southwest.

  • Assays are pending for an additional eight completed drill holes (approximately 1,520m), and the drill program is ongoing.

"These near-surface, higher-grade intercepts continue to support our view that the Tyro Main Zone has the potential to be one of the highest grade open-pittable projects in northwest Arizona and have grades well above the nearest permitted open-pit deposit," stated CEO, Quentin Mai. "A portion of the completed drill holes with pending assay results include the first holes drilled into the Frisco Graben, which is only one of the multiple large-scale targets on the project."

Figure 1: Preliminary Tyro Main Zone Long Section showing results from the 2025 RC drill program, previous drill results, trenches and 200-Level Sampling

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/5717/248683_dc16769e14575a93_002full.jpg

Notes:

  • Drill holes GC21-13 to GC21-16 released October 25, 2021 (link here)

  • Underground chip-channel sampling results released April 28, 2022 (link here)

  • Drill holes GC23-23 to GC23-28 released February 28, 2023 (link here)

  • Surface trench results released July 11, 2024 (link here)

  • Drill holes GC24-30 to GC24-31 released January 15, 2025 (link here) and updated February 24, 2025 (link here)

  • Drill holes GC24-29, GC24-32 to GC24-36 released January 23, 2025 (link here) and updated February 24, 2025 (link here)

  • Drill holes GC25-38 and GC25-39 released March 19, 2025 (link here)

  • Drill holes GC25-37, GC25-40 and GC25-41 released April 3, 2025 (link here)

Table 1: Drill Results

Holes

From (m)

To (m)

Width (m)

Grade (g/t Au)

GC25-42

120.40

149.35

28.95

1.92

incl.

128.02

129.54

1.52

5.22

and incl.

135.64

140.21

4.57

3.65

GC25-43

89.92

112.78

22.86

3.34

incl.

97.54

100.58

3.04

16.01

incl.

99.06

100.58

1.52

23.50