Unlock stock picks and a broker-level newsfeed that powers Wall Street.

West Point Gold Infill Sampling Significantly Expands Mineralized Zones; GC24-30 to 89.5m of 1.08 g/t Au and GC24-32 to 51.16m of 1.21 g/t Au

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - February 24, 2025) - West Point Gold Corp. (TSXV: WPG) (OTCQB: WPGCF) (FSE: LRA0) ("West Point Gold" or the "Company") is pleased to announce the results from infill sampling on holes GC24-30, GC24-31 and GC24-32 demonstrating that mineralization at the Tyro Main Zone is wider and more continuous than previously thought.

Highlights:

  • Hole GC24-30 is now reported as 89.50m of 1.08 g/t Au which includes intervals of 55.61m of 1.44 g/t Au and 36.10m of 2.02 g/t Au (Table 1 and 2).

  • Hole GC24-32 is now reported as 51.16m of 1.21 g/t Au (Table 1 and 2).

  • Results from infill sampling increased the width of the overall mineralized package to greater than 50 metres.

  • Results continue to support the previously announced exploration target at the Tyro Main Zone.

"We are excited by the material increase in width for both holes GC24-30 and GC24-32 in the middle section of the nearly 1000 metre Tyro Main Zone suggesting that the overall zone may be wider than initially anticipated," stated CEO, Quentin Mai. "We expect that the planned drill program will give us additional insight into the Tyro Main Zone as we work towards developing a maiden resource."

Figure 1: Preliminary Tyro Main Zone Long Section showing results from 2024 DDH program
along with RC drilling, trenches and 200 Level Sampling

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/5717/242033_a4a39c3be4878836_002full.jpg

Table 1: Select Drill Results from the 2024 Diamond Drill Program

Holes

From (m)

To (m)

Width (m)

Grade (g/t Au)

GC24-29

0.00

16.15

16.15

0.56

incl.

12.19

16.15

3.96

1.84

and

99.97

118.50

18.53

0.26

and

158.05

165.51

7.46

0.98

GC24-30

7.80

95.75

89.50

1.08

incl.

7.80

27.90

20.10

0.77

incl.

7.80

10.36

2.56

2.85

incl.

24.70

25.30

0.60

6.59

and incl.

40.14

95.75

55.61

1.44

incl.

43.50

79.60

36.10

2.02

incl.

92.60

95.75

3.15

1.49

GC24-31

23.00

27.10

4.10

2.17

incl.

24.15

27.10

2.95

2.86

and

51.30

101.95

50.65

0.53

incl.

51.30

63.35

12.05

0.58

and incl.

73.76

100.55

26.79

0.67

GC24-32

16.31

65.15

51.16

1.21

incl.

16.31

23.25

6.94

4.34

incl.

16.31

17.75

1.44

15.24

and incl.

30.90

33.00

2.10

3.19

and incl.

49.07

65.15

16.08

1.35

incl.

57.25

60.50

3.25

3.10

GC24-33

77.30

77.95

0.65

0.54

GC24-34

0.00

42.80

42.80

2.50

incl.

24.20

35.90

11.70

5.94

GC24-35

0.00

9.10

9.10

1.82

and

113.54

124.40

10.86

0.21

and

140.21

168.20

27.99

0.89

incl.

154.50

168.20

13.70

1.58

 

Notes:

  • All widths shown are down hole; true width is approximately 80% of down hole width, except hole GC24-29 where true width is unknown.

Table 2: Holes GC24-30 and GC24-32 as previously reported

Holes

From (m)

To (m)

Width (m)

Grade (g/t Au)

GC24-30

7.80

10.36

2.56

2.85

and

24.70

25.30

0.60

6.59

and

43.50

95.75

52.25

1.53

incl.

43.50

79.60

36.10

2.02

and incl.

92.60

95.75

3.15

1.49

GC24-32

16.31

23.25

6.94

4.34

incl.

16.31

17.75

1.44

15.24

and

30.90

33.00

2.10

3.19

and

49.07

65.15

16.08

1.35

incl.

57.25

60.50

3.25

3.10