Unlock stock picks and a broker-level newsfeed that powers Wall Street.

West Point Gold Drills 30.48m of 9.05 g/t Au, 33.52m of 5.46 g/t Au, and 28.96m of 6.02 g/t Au

In This Article:

Defines New High-Grade Zone on Patented Ground at Gold Chain Project, Arizona

Vancouver, British Columbia--(Newsfile Corp. - April 22, 2025) - West Point Gold Corp. (TSXV: WPG) (OTCQB: WPGCF) (FSE: LRA0) ("West Point Gold" or the "Company") is pleased to announce the most recent drill results from its ongoing reverse circulation drill program at the Tyro Main Zone, Gold Chain Project, Arizona. This release contains the assays for drill holes GC25-47 to GC25-49, totalling 499.9m.

Highlights:

  • Hole GC25-49 intersected 30.48m of 9.05 g/t Au within 62.49m of 4.73 g/t Au. This hole included 7.62m of 12.11 g/t Au, 12.19m of 12.40 g/t Au and 1.52m of 39.1 g/t Au.

  • Hole GC25-47 intersected 33.52 m of 5.46 g/t Au within 50.29m of 3.76 g/t Au. This hole included 4.57m of 12.05 g/t Au and 10.67m of 8.54 g/t Au.

  • Hole GC25-48 intersected 28.96 m of 6.02 g/t Au within 41.15m of 4.33 g/t Au. This hole included 4.67m of 19.04 g/t Au and 1.53m of 10.70 g/t Au.

  • Based on these results and the results from GC24-34 (42.8m of 2.50 g/t - Released January 23, 2025) there appears to be a significant higher-grade zone developing at northeast part of the Tyro Main Zone

  • Assays are pending for an additional 7 completed drill holes (approximately 1,533m) and the drill program is ongoing.

"The results from these three holes in the northeastern portion of the Tyro Main Zone have defined a new high-grade zone with a current drilled strike extent of approximately 100m. The current results suggest that this higher-grade zone plunges to the northeast toward the Frisco Graben, stated CEO Quentin Mai. "These three high-grade intercepts are expected to have a significant impact on building a maiden resource at Tyro, which is on patented ground in the southwestern US."

Table 1: Drill Results

Holes

From (m)

To
(m)

Width
(m)

Grade
(g/t Au)

GC25-47

79.25

129.54

50.29

3.76

incl.

79.25

117.35

38.10

4.86

incl.

82.30

115.82

33.52

5.46

incl.

86.87

91.44

4.57

12.05

and incl.

99.06

109.73

10.67

8.54

GC25-48

83.82

124.97

41.15

4.33

incl.

83.82

112.78

28.96

6.02

incl.

88.39

106.68

18.29

8.89

incl.

91.34

96.01

4.67

19.04

and incl.

103.63

105.16

1.53

10.70

GC25-49

80.77

143.26

62.49

4.73

incl.

100.58

131.06

30.48

9.05

incl.

102.11

109.73

7.62

12.11

incl.

102.11

106.68

4.57

15.57

and incl.

117.35

129.54

12.19

12.40

incl.

124.97

126.49

1.52

39.10

Notes:

  • All widths shown are downhole; true width is approximately 60% of downhole width.

Figure 1: Isometric View of the northeast part of the Tyro Main Zone, including historical and current drilling

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/5717/249347_fa18a652c46359b1_002full.jpg