ValOre Provides Exploration Update and Reports Initial Trado® Auger and Rock Assay Results; Salvador Target, Pedra Branca PGE Project, Brazil;

In This Article:

VANCOUVER, British Columbia, Sept. 10, 2024 (GLOBE NEWSWIRE) -- ValOre Metals Corp. (“ValOre”; TSXV: VO; OTCQB: KVLQF; Frankfurt: KEQ0, “the Company”) today provided an update on the ongoing exploration program for the Salvador target (“Salvador”) at ValOre’s 100%-owned Pedra Branca Platinum Group Elements (“PGE”, “2PGE+Au”) Project (“Pedra Branca”) in northeastern Brazil.

“Our ongoing exploration program at the Salvador target has yielded encouraging results, with initial Trado® and rock assays, trenching and field mapping all confirming in-situ PGE mineralization and extending the prospective Salvador PGE trend to 2 km in strike length,” stated ValOre’s VP of Exploration, Thiago Diniz. “Additionally, preliminary ground geophysical data shows consistent magnetic anomalies along strike, which increases our confidence that this program will set the stage for future discoveries and resource expansion drill programs at Salvador.”

2024 Salvador Exploration Program Highlights

Salvador field exploration program is in progress, with Trado® auger drilling, rock sampling and trenching confirming continuity of PGE-bearing ultramafic (“UM”) rocks along trend to the north of the 2023 drill zone:

  • PGE mineralization reported in 15 of 20 UM-bearing Trado® holes;

  • High-grade PGE assay results reported from outcropping chromitite:

    • 11.17 grams per tonne palladium + platinum + gold (“g/t 2PGE+Au”) – Sample 103792;

  • Trench mapping and sampling is completed, with 108 samples sent for assay analysis;

  • Ground geophysical survey field work is completed, interpretation ongoing;

  • Additional field mapping, rock sampling, and Trado® auger drilling following up on new ultramafic occurrences and preliminary magnetic anomalies in the north extension of the target area continues;

  • Current results and new UM occurrences extend Salvador’s PGE-prospective trend to a total of 2 km in strike-length;

See Figure 1 for a plan view of the Salvador target, and location of the 2024 exploration work; and Table 1 for a summary of the exploration totals for Trado® and trenching programs.

240910 VO NR Figure 1
240910 VO NR Figure 1


Figure 1: Salvador target plan view, with location of the 2024 exploration work activities.

Table 1: Trado® and trenching exploration totals to date.

Target

Activity

# Holes/Trenches

Total Meters

UM Length (m)

Total
#assays

# Assays
pending

Salvador

Trado Auger Drilling

35

101

77

107

21

Salvador

Trenching

4

95

51

108

108


Trado
® auger drilling

Trado® auger drilling has intercepted ultramafic rocks in 25 of 35 Trado® auger drill holes completed to date (77 m of 101 m drilled in total).

Trado® assay results have been received for 20 UM-bearing Trado holes, with PGE mineralization reported in 15 Trado® holes.