Unigold Inc.: Drilling Intersects 74.0 m Averaging 1.33 g/t, Including 13.0 m Averaging 3.78 g/t Au Near-Surface Gold Mineralization at Candelones Connector Zone

TORONTO, ONTARIO--(Marketwired - Jun 13, 2013) - Unigold Inc. ("Unigold" or the "Company") (TSX VENTURE:UGD) is pleased to report that drilling at the Candelones Connector Zone has identified continuous, near-surface gold mineralization at the Company's wholly owned Neita Concession in the Dominican Republic.

Highlights include:

  • DCZ 24 74.0 metres averaging 1.33 g/t Au including 13.0 metres averaging 3.78 g/t Au;

  • DCZ 25 36.5 metres averaging 1.07 g/t Au;

  • DCZ 26 26.0 metres averaging 1.18 g/t Au; and

  • DCZ 28 5.0 metres averaging 2.52 g/t Au.

Exploration drilling at the Connector Zone was undertaken to follow up on several, widely scattered intervals of anomalous gold mineralization from historical drill holes.

These latest results originate from three separate target areas (Figure 1-3); the current southeastern boundary of the Candelones Main Zone (Target 1), the southwestern limit of the identified silicic alteration (Target 2); and the eastern limit of the silicic alteration (Target 3).

"The Connector Zone keeps showing near and at surface gold mineralization which is potentially important in the early life of a mine pit. At Target 2, a significant amount of gold mineralization is being defined over a length and width of 250 m and is still open" commented Andrew Cheatle, President and CEO Unigold Inc. "We are also excited that step out drilling has started at Rancho Pedro as we explore new areas."

TARGET 2

Drilling at Target 2 (Table 1) was successful with 100% of the 14 holes completed in this area intersecting potentially significant gold and base metal mineralization, including 74.0 m averaging 1.33 g/t Au and 0.1% Cu.

Drilling has, to date, traced the mineralization along strike for 250 m, from Section 216850 East (Figure 4) through Section 217050 East (Figure 8). The mineralization has been traced for 200 to 250 m on each section, outlining a zone measuring 250 m x 250 m x 50 m in size. The mineralization consistently extends from surface to a maximum depth of 50 m; the top 30 m are typically intensely oxidized.

Metallurgical tests on oxide mineralization in 2007 indicated gold recovery in the oxides typically exceed 90%, making the Target 2 area particularly interesting.

The Target 2 area remains open to the North (towards the Candelones Main Zone) as well as to the East and West. Future drilling is planned to test the potential to further expand this mineralization.

Table 1: Recent Drill Results Candelones Connector Zone - Target 2 Area (Figures 3 - 8)

Hole ID

From

To

Interval

Au

Ag

Cu

Zn

(g/t)

(g/t)

(%)

(%)

DCZ 24

0.0

74.0

74.0

1.33

5.0

0.1

%

0.5

%

incl

0.0

17.0

17.0

1.32

9.0

0.0

%

0.0

%

incl

59.7

72.7

13.0

3.78

5.1

0.4

%

2.2

%

DCZ 25

0.0

36.5

36.5

1.07

5.9

0.1

%

0.1

%

incl

3.7

26.0

22.3

1.37

8.8

0.1

%

0.0

%

DCZ 26

8.0

17.7

9.7

0.76

1.5

0.0

%

0.0

%

and

30.0

56.0

26.0

1.18

3.8

0.2

%

0.0

%

incl

31.0

48.0

17.0

1.66

4.4

0.2

%

0.0

%

DCZ 27

0.0

15.5

15.5

0.46

3.9

0.1

%

0.0

%

DCZ 28

0.0

50.8

50.8

0.72

4.6

0.2

%

0.1

%

incl

0.0

20.0

20.0

0.87

7.5

0.0

%

0.0

%

incl

31.0

50.8

19.8

0.90

1.7

0.4

%

0.2

%

and

61.9

67.0

5.1

2.52

1.1

0.2

%

0.4

%

DCZ 29

26.7

31.0

4.3

0.66

0.6

0.0

%

0.1

%

DCZ 30

0.0

65.0

65.0

0.33

1.1

0.0

%

0.1

%

incl

35.0

42.3

7.3

1.08

2.4

0.1

%

0.3

%

DCZ 31

66.0

93.3

27.4

0.34

1.7

0.0

%

0.1

%

DCZ 32

22

38.7

16.7

0.53

1.2

0.0

%

0.2

%

and

43.35

51

7.65

0.51

0.5

0.0

%

0.2

%

DCZ 33

7

39

32

0.48

1.2

0.0

%

0.3

%

DCZ 34

60.25

75.5

15.25

0.15

0.0

0.0

%

0.0

%

DCZ 35

47

53

6

0.39

0.2

0.0

%

0.1

%

DCZ 36

2

26

24

0.53

4.2

0.0

%

0.0

%

incl

2

12

10

1.03

9.3

0.0

%

0.0

%

DCZ 37

0

11

11

1.09

9.9

0.0

%

0.0

%

The results reported represent down hole sample intervals and not true widths. True widths cannot be reported at this time.

TARGET 1

Drilling at Target 1 (Table 2) intersected pervasive, mineralization including 28.0 m averaging 0.97 g/t Au with associated base metals. The results confirm that low grade gold and base metal mineralization persists in this target area, offering some potential for resource expansion.