Tudor Gold Extends Gold Zone at Treaty Creek to Over One Kilometer

Vancouver, British Columbia--(Newsfile Corp. - October 12, 2017) - Tudor Gold Corp. (TSXV: TUD) (FSE: TUC) (the "Company" or "Tudor Gold") is pleased to report on the results of the first four holes of the Copper Belle zone and on the completion of the resource delineation program for the Copper Belle zone of the Treaty Creek property.

The Copper Belle resource delineation drill program was completed with 27 holes to depths below 700 meters and with step outs of 50 meters where it was possible. Over 13,722 meters of drilling was completed in the Copper Belle zone in 2017.

CB-17-04, the first step-out hole drilled this year on the Copper Belle zone, intersected 176.2 meters of continuous mineralization which returned 0.80 g/T Au from 152.1 to 328.5 meters depth. Hole CB-17-04 was collared 40 meters north of CB-16-03 where topography permitted. Complete results are pending for the remaining 23 holes.

Drill results for the first four Copper Belle holes at Treaty Creek are summarized in the table below:

Hole-ID

From (m)

To (m)

Interval (m)*

Au (g/T)

Ag (g/T)

Cu (%)

CB-17-04

152.10

328.50

176.20

0.801

1.0

0.008


including







152.10

180.60

28.50

1.071

2.0

0.010


192.70

202.80

10.10

2.897

1.3

0.007


219.00

280.00

61.00

0.702

0.7

0.007

CB-17-05

98.20

102.30

4.10

0.926

2.3

0.012

CB-17-06

182.50

592.50

410.00

0.672

3.1

0.037


including







182.50

199.50

17.00

0.678

1.4

0.010


214.50

460.50

246.00

0.726

2.9

0.034


475.50

592.50

117.00

0.708

4.5

0.054

CB-17-07

161.00

530.00

369.00

0.686

2.4

0.032


including







203.00

246.50

43.50

1.810

11.88

0.142


507.50

530.00

22.50

1.494

3.7

0.036

* - True widths of the mineralization have not been determined.

Results from subsequent drill holes from the 2017 drill program at Copper Belle are still pending. Drill holes targeted the mineralized zone on Copper Belle and all holes to date have intersected long intervals of mineralization to depth. Drill holes were targeted oblique to the northwesterly plunge of the main mineralized zone. The drill program was designed for approximately 50 meter step-outs across the mineralized zone to create a block of delineated mineralization for a preliminary resource estimate. All drill holes were down hole surveyed at 25 m stations using a Reflex Multi-shot device.

The Copper Belle resource estimate will use data from 27 holes from 2017, three holes from 2016, 17 holes from 2009 and 10 holes from 2007, for a total of 22,970 meters drilled. These drill holes cover an area of approximately 250 meters wide by a kilometer long. Copper Belle zone mineralization is open in all directions and to depth.

The HC drill program consisted of 17 drill holes totaling 5,401 meters that tested the mineralized stratabound structure for a strike length of 400 meters and 400 meters down dip (still open at depth), and the vein system remains open to the north, south and at depth. The program was designed with a maximum of 50 meter step-outs in the mineralized zone to prepare for a preliminary resource estimate in this area. Assay results are pending for the remaining holes.