True Gold Intersects 1.91 g/t Gold Over 70.5 Metres at Northern Karma Target

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Aug. 20, 2013) - True Gold Mining Inc. (TSX VENTURE:TGM) ("True Gold" or the "Company") is pleased to announce that assay results from recent core drilling at a Northern Karma target has confirmed strong, near-surface oxide gold mineralization within potential trucking distance of the proposed infrastructure site1 at the Karma Gold Project ("Karma Project") in Burkina Faso, West Africa.

Of the nine core holes drilled at the Watinoma target, two holes were near-twins of previously drilled reverse circulation ("RC") holes, showing a general improvement in grade (1.91 g/t Au over 70.5 metres in RNG-DD-13-001 versus 1.31 g/t Au over 72.0 metres in RNG-13-RC-0012). Results from six of the nine core holes revealed significant gold mineralization over a distance of 600 metres, reinforcing the area's strong prospectivity.

Assay highlights from recent core drilling include:

Near-twin holes (collars within five metres):

  • 1.91 g/t Au over 70.5 metres, including 8.66 g/t Au over 4.5 metres, in RNG-DD-13-001 (near-twin of RNG-13-RC-001)

  • 0.89 g/t Au over 42.5 metres, including 1.41 g/t Au over 12.4 metres, in RNG-DD-13-003 (near-twin of RNG-13-RC-005)

New holes:

  • 1.92 g/t Au over 11.1 metres, in RNG-DD-13-002

  • 3.27 g/t Au over 8.00 metres and 1.05 g/t Au over 20.0 metres, in RNG-DD-13-004

  • 0.45 g/t Au over 10.18 metres, in RNG-DD-13-005

  • 1.79 g/t Au over 4.5 metres, in RNG-DD-13-007

"We are pleased with the results of the core drilling program and our exploration work to date at Watinoma. They confirm the presence of widespread near-surface gold mineralization and strongly support our goal of adding near-surface oxide material within trucking distance of our proposed Karma Project processing facility1," said Dwayne Melrose, President & CEO, True Gold. "Watinoma remains a high-priority target for our Company, and will be the focus of follow-up exploration work in Q4-2013."

To see a drill map for Watinoma, please click here: http://www.truegoldmining.com/sites/default/files/KarmaDrillMap1329.pdf

For a full table of results related to gold mineralization, please click on this link: http://www.truegoldmining.com/sites/default/files/KarmaDrillResults1329.pdf

True Gold completed 1,375 metres of core drilling at Watinoma in June 2013 as a follow-up to an RC program in Q2-2013. An extensive rotary air blast ("RAB") campaign completed in 2012 also returned positive results, highlighted by 2.15 g/t Au over 30.0 metres in hole RAB-4143. The RAB program included 11,039 metres of drilling in 449 vertical holes at sites selected based on historical workings and anomalous geochemical sampling. It confirmed six distinct drill-ready areas of anomalous gold mineralization. RAB-defined targets east of the area of core drilling add to True Gold's interest in Northern Karma.