Troilus Reports Record Intercept of 2.44 g/t AuEq Over 56m in the Southwest Zone

In This Article:

Troilus Gold Corp.
Troilus Gold Corp.

MONTREAL, April 29, 2025 (GLOBE NEWSWIRE) -- Troilus Gold Corp. (“Troilus” or the “Company”) (TSX: TLG; OTCQX: CHXMF; FSE: CM5R) is pleased to announce positive drill results from its 2025 drill campaign (outlined in the February 4, 2025 press release). The program is focused on identifying and delineating higher-grade mineralization and enhancing confidence in the block model.

The results reported today include the best intercept drilled to date in the Southwest Zone (“Southwest”) based on linear grade (grade x width). These results confirm the continuity of higher-grade material within the Phase 1 reserve pit, which covers Years 1 to 5 of the mine plan. All intercepts reported lie within the current mine plan and drill hole locations relative to the Southwest reserve pit are shown in Figure 1. All grades are uncut and true thicknesses are approximately 75% to 90% of drilled length.

Southwest Drill Intercept Highlights:

  • Hole SW-25-688 intersected 2.44 g/t gold equivalent (“AuEq”) (2.03 g/t Au, 2.55 g/t Ag, 0.23 % Cu) over 56 m, including 3.28 g/t AuEq (2.74 g/t Au, 3.38 g/t Ag, 0.29 % Cu) over 34 m starting at 174 metres This is the best drill intercept in the history of the Southwest in terms of linear grade.

  • Hole SW-25-679 intersected 1.22 g/t AuEq (1.13 g/t Au, 0.81 g/t Ag, 0.04 % Cu) over 51 m including 6.82 g/t AuEq (6.71 g/t Au, 2.90 g/t Ag, 0.05 % Cu) over 1 m, 1.75 g/t AuEq (1.71 g/t Au, 0.46 g/t Ag, 0.02 % Cu) over 9 m, 15.39 g/t AuEq (15.25 g/t Au, 0.60 g/t Ag, 0.08 % Cu) over 1 m, and 8.18 g/t AuEq (7.33 g/t Au, 8.50 g/t Ag, 0.44 % Cu) over 1 m starting at 9 metres downhole.

  • Hole SW-25-712 intersected 0.97 g/t AuEq (0.68 g/t Au, 0.80 g/t Ag, 0.14 % Cu) over 73 m, including 1.84 g/t AuEq (1.34 g/t Au, 0.76 g/t Ag, 0.29 % Cu) over 19 m starting at 189 metres downhole.

Justin Reid, CEO of Troilus Gold, commented, “We are very encouraged by the latest results from the Southwest Zone, which will be the first area mined when production begins. Hole SW-25-688 returned the highest linear-grade intercept drilled to date in this zone, highlighting the continuity of wide, high-grade mineralization in the core of the deposit. Additionally, SW-25-679 encountered strong near-surface grades that could further strengthen the early years of the mine plan. As the campaign progresses, we look forward to sharing more results that continue to improve confidence of the block model, de-risk the early production years, and enhance the overall development plan for the Troilus Project.”

*The completed NI 43-101 technical report associated with the Troilus Project FS can be found on SEDAR+ at www.sedarplus.ca under the Company’s issuer profile or on the Company’s website at www.troilusgold.com.

Waiting for permission
Allow microphone access to enable voice search

Try again.