TransGlobe Energy Corporation Operations Update

AIM & TSX: “TGL” & NASDAQ: “TGA”

This Announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No. 596/2014 (“MAR”). Upon the publication of this Announcement, this inside information is now considered to be in the public domain.

CALGARY, Alberta, Sept. 29, 2021 (GLOBE NEWSWIRE) -- TransGlobe Energy Corporation (“TransGlobe” or the “Company”) provides the following operations update. All dollar values are expressed in US dollars unless otherwise stated.

COMPANY PRODUCTION

Production Summary (WI before royalties and taxes):

(Boepd)

Q2 2021

Jul 2021

Aug 2021

Sep 2021
(to Sep 18th)

YTD Average

Egypt

10,727

11,311

11,541

11,214

10,758

Canada

2,350

2,230

2,010

1,986

2,144

Total

13,077

13,541

13,551

13,200

12,902

Compared to Q2, 2021, during the current quarter to date, natural production declines in Egypt were more than offset by well optimization activities and new drilling. Production in Canada declined naturally while awaiting the production start from recent new drilling, which is anticipated in early Q4-2021.

Please see the table entitled “Production Disclosure” at the end of this news release for the detailed constituent product types and their respective quantities measured at the first point of sale for all production amounts disclosed in this news release on a Bopd and Boepd basis.

Arab Republic of Egypt

Eastern Desert (100% WI)

The Company continues to utilize the EDC-64 rig drilling development oil wells.

In West Bakr, during the quarter, the Company successfully drilled two development oil wells and is moving on to a third well, K-66, at quarter end.

The K-62 development well was drilled to a total depth of 1,473 meters, and encountered oil-bearing sands in the Asl-A formation. The reservoir section has been fully logged and evaluated, with an internally estimated 24.2 meters of net oil pay in the Asl-A reservoirs. The Asl-A2 was completed for oil production.

The second well in West Bakr, K-65, was drilled to a total depth of 1,730 meters, and encountered oil-bearing sands in the Asl-A, Asl-B, Asl-C, Asl-D and Asl-E formations. The reservoir section has been fully logged and evaluated, with an internally estimated 10.6 meters of net oil pay in the Asl-A sand, 12.5 meters of net oil pay across the Asl-B sand, 6.1 meters of net oil pay across the Asl-C sand, 5.5 meters of net oil pay across the Asl-D sand and 11.4 meters of net oil pay in the Asl-E sand (total net oil pay 46.1 meters). The Asl-E is expected to be completed for production in this well. The Asl-A, Asl-B, Asl-C, and Asl-D are expected to be recovered through future recompletions of this well.