Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Tocvan Commences Drilling at Gran Pilar Gold - Silver Project Continues Expansion Zone Drilling Along Northern Corridors

In This Article:

Highlights:

  • RC Drilling Has Recommenced at Gran Pilar's Expansion Zone

    • Next Phase of 1,500m Planned, Potential to Expand

    • Follow-up on Initial Scout Drilling Success

      • 3.1m of 19.4 g/t Au, within 106.6m of 0.6 g/t Au (JES-24-101)

      • 16.8m of 0.4 g/t Au and 6 g/t Ag (JES-24-102)

    • Target Area Spans 675 meters Over Northern Zone

    • Results Pending for Three Core Holes

CALGARY, AB / ACCESS Newswire / April 10, 2025 / Tocvan Ventures Corp. (the "Company") (CSE:TOC)(OTCQB:TCVNF)(WKN:TV3/A2PE64), is pleased to announce drilling has restarted at the Gran Pilar Gold Silver Project in mine-friendly Sonora, Mexico. Drilling will focus on the 100% controlled expansion area where recent scout drilling returned significant mineralization highlighted by 3.1 meters of 19.4 g/t Au within 106.6 meters of 0.6 g/t Au, just six meters from surface (12.2 meters downhole). Drilling started the evening of April 7th, over 100 meters are completed already in the first drill hole. Results are pending for three core holes.

"We are excited to be back drilling the expansion zone where recent results returned high-grade gold at surface." commented, CEO Brodie Sutherland. "Following up on our success, testing the northern edge of known mineralization with drilling will provide us with further insight on the resource potential. There remains a large untested area to the north and east where we will continue to push expansion. In addition, the northern alteration zone five kilometers away, remains open for exploration where a separate mineralized system has the potential to add further discovery upside. We look forward to updating our shareholders with continued drill results and advancements in permitting for production."

<i>Figure 1. 3D Long Section of the Main Zone and the new Expansion Target to the north (left side of image).</i>
Figure 1. 3D Long Section of the Main Zone and the new Expansion Target to the north (left side of image).
<i>Figure 2. Planview map of the Main Zone area and immediately north where recent RC drilling has discovered the extension of mineralization along parallel trends. Recent drill results are highlighted. Below, Photos from RC Drilling at Gran Pilar.</i>
Figure 2. Planview map of the Main Zone area and immediately north where recent RC drilling has discovered the extension of mineralization along parallel trends. Recent drill results are highlighted. Below, Photos from RC Drilling at Gran Pilar.
<i>Figure 3. Gran Pilar Project Overview, > 22km<sup>2 </sup>of prospective ground with two primary targets: South Block, the direct extension and expansion of the historic Main Zone defined by an expanding vein field of untested drill targets; North Block a 3.2-km by 1.5-km pyrite and clay alteration zone that coincides with high-grade gold-silver, the area remains largely untested.</i>
Figure 3. Gran Pilar Project Overview, > 22km2 of prospective ground with two primary targets: South Block, the direct extension and expansion of the historic Main Zone defined by an expanding vein field of untested drill targets; North Block a 3.2-km by 1.5-km pyrite and clay alteration zone that coincides with high-grade gold-silver, the area remains largely untested.

Pilar Drill Highlights:

  • 2024 RC Drilling Highlights include (all lengths are drilled thicknesses):

    • 42.7m @ 1.0 g/t Au, including 3.1m @ 10.9 g/t Au

    • 56.4m @ 1.0 g/t Au, including 3.1m @ 14.7 g/t Au

    • 16.8m @ 0.8 g/t Au and 19 g/t Ag

  • 2022 Phase III Diamond Drilling Highlights include (all lengths are drilled thicknesses):

    • 116.9m @ 1.2 g/t Au, including 10.2m @ 12 g/t Au and 23 g/t Ag

    • 108.9m @ 0.8 g/t Au, including 9.4m @ 7.6 g/t Au and 5 g/t Ag

    • 63.4m @ 0.6 g/t Au and 11 g/t Ag, including 29.9m @ 0.9 g/t Au and 18 g/t Ag

  • 2021 Phase II RC Drilling Highlights include (all lengths are drilled thicknesses):

    • 39.7m @ 1.0 g/t Au, including 1.5m @ 14.6 g/t Au

    • 47.7m @ 0.7 g/t Au including 3m @ 5.6 g/t Au and 22 g/t Ag

    • 29m @ 0.7 g/t Au

    • 35.1m @ 0.7 g/t Au

  • 2020 Phase I RC Drilling Highlights include (all lengths are drilled thicknesses):

    • 94.6m @ 1.6 g/t Au, including 9.2m @ 10.8 g/t Au and 38 g/t Ag;

    • 41.2m @ 1.1 g/t Au, including 3.1m @ 6.0 g/t Au and 12 g/t Ag ;

    • 24.4m @ 2.5 g/t Au and 73 g/t Ag, including 1.5m @ 33.4 g/t Au and 1,090 g/t Ag

  • 15,000m of Historic Core & RC drilling. Highlights include:

    • 61.0m @ 0.8 g/t Au

    • 21.0m @ 38.3 g/t Au and 38 g/t Ag

    • 13.0m @ 9.6 g/t Au

    • 9.0m @ 10.2 g/t Au and 46 g/t Ag