Third Dalradian test stope recovers 35% more gold than predicted in resource model

TORONTO, ONTARIO--(Marketwired - Dec 8, 2016) - Dalradian Resources Inc. (DNA.TO) (DALR.L) ("Dalradian" or the "Company") announces results from a third test stope at its Curraghinalt Gold Project in Northern Ireland. Stope 3 is located on the V-75 vein complementing two previous test stopes in the same area. The third stope was used to validate the long-hole mining method on a relatively shallow dipping (50-55°) portion of the vein in comparison to Stopes 1 and 2, which had dips of 73° and 76° respectively. Stope 3 attained an average width of 1.80 metres, with estimated dilution to the designed stope of 64% and removal of an estimated 303 ounces of gold at a grade of 9.41 g/t from 1,001 tonnes of material.

Eric Tremblay, Chief Operating Officer of Dalradian commented,

"I am particularly pleased with the results from the third stope. This demonstrates our ability to long-hole stope veins at the shallow end of the range that we are likely to encounter at this deposit. The dilution was lower than predicted by the model and resulted in a diluted grade of 9.41 g/t of gold. With the exception of a single wedge failure in the footwall at the end of mining, Stope 3 remained open without support for several weeks. This indicates that we can easily manage dilution from the footwall by using simple low cost methods such as cable bracing."

Table 1: Comparison of contained ounces of gold between resource model and test stoping results

Contained gold

Resource model estimation

Test stoping results

Stope 3 (oz)

224

303

Increase from resource model estimation (%)

35%

Table 2: Comparison of stope design vs. actual results

Average width (m)*

Dip (degrees)

Tonnes

Estimated grade (g/t)**

Estimated contained gold ounces

Estimated dilution on design****

Stope 3

Design***

1.1

55

655

10.63

224

N.A.

Actual results

1.8

55

1,001

9.41

303

64%

*True widths

** Design grade is based on the 2016 resource model; actual results grade is based on extensive muck sampling

*** Design width is the minimum width necessary to recover all of the mineralized material predicted

**** Post-mining volume was corrected to reflect removal of a single 190 tonne non-dilutory slab which fell into the stope void in the absence of normal operational ground support methods and after mucking

The third test stoping area is in close proximity to the first two test stopes, approximately 60 metres below the surface on the V-75 vein at the deepest point of the current development (see figures 1-3 for location; all figures referenced in this news release can be accessed at http://www.dalradian.com/news-and-events/news-releases/news-releases-details/December-8-2016-News-Release-Figures/default.aspx). This location was selected as it contained shallower dipping veining than in Stopes 1 and 2, thereby testing long-hole mining in a more broadly representative manner.