A.I.-Targeted Infill Drilling Intersects 9.01 g/t Au over 19.0 m at STLLR Gold's Tower Gold Project

In This Article:

Toronto, Ontario--(Newsfile Corp. - March 31, 2025) - STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) ("STLLR" or the "Company") is pleased to announce infill drilling results using artificial intelligence technology ("AI") at the Tower Gold Project ("Tower") in the Timmins Mining Camp in Ontario, Canada.

Table 1: 2025 Tower Infill Drilling Highlights - 903 Deposit (For more information, see Tables 2 & 3 and Figures 1-4):

Zone

Hole ID

Assay Result

903

MGA25-224

9.01 grams per tonne gold ("g/t Au") (uncut) over 19.0 metres ("m")
(including 124.50 g/t Au over 1.25 m)

903

MGA25-226

1.30 g/t Au over 22.65 m (including 2.10 g/t Au over 11.50 m)

 

Keyvan Salehi, P.Eng., MBA, President, CEO, and Director of STLLR, commented: "We are encouraged by the infill drilling results at the 903 Deposit. Using AI, we designed the drill holes to optimize the conversion of mineralization to higher confidence levels. The program intersected near-surface mineralization with grades exceeding the 903 Deposit's current Mineral Resource Estimate1."

"We are on track to deliver an updated Mineral Resource Estimate and Preliminary Economic Assessment for Tower in the first half of 2025. Additionally, our Hollinger Tailings Project characterization program is progressing well, with assay results expected in the coming weeks."

903 Deposit Infill Drilling

The 903 Deposit, part of the Garrison Area at the Tower Gold Project, features gold mineralization linked to quartz veining within syenites hosted in highly deformed, carbonatized ultramafic volcanics of the Kidd-Munro assemblage. It lies along the Destor-Porcupine Fault Zone, with meta-sediments of the Porcupine assemblage located to the north.

Using AI to optimize drill meterage and mineral resource conversion, STLLR's infill program intersected near-surface mineralization with grades higher than the current 903 Deposit Mineral Resource Estimate1, potentially enhancing confidence in the targeted areas. The Company has completed 3,500 m of a 5,000 m program and will release the remaining results when they become available.



Figure 1: Tower Gold Project - Drill Location Map
1

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/4852/246651_750da352b4bda840_001full.jpg



Figure 2: 903 Deposit - Infill Drilling Results Map1

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/4852/246651_750da352b4bda840_002full.jpg



Figure 3: 903 Deposit - Infill Drilling Cross Section "B-A" Looking Northeast
1