T2 Metals Files NI43-101 Technical Report for Sherridon Copper-Zinc-Gold Project, Manitoba

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - November 1, 2024) - T2 Metals Corp. (TSXV: TWO) (OTCQB: TWOSF) (WKN: A2DR6E) ("T2" or the "Company") is pleased to announce the filing of an independent Technical Report for Sherridon copper-zinc-gold project in western central Manitoba on the Company's profile on SEDAR+ at www.sedarplus.ca.

The Technical Report was prepared in accordance with the Canadian Securities Administrators' National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101"). The author and qualified person (as defined in NI 43-101) for the Technical Report is Mr. Darrell Turcotte, who has reviewed the technical content of this news release and approved its dissemination.

Sherridon is a well-known volcanogenic massive sulphide ("VMS") camp in the Flin Flon – Snow Lake Greenstone Belt, with a significant mining and exploration history. The Project has year-round road access, is 70km from the mining centre of Flin Flon, and lies upon an operational train line.

Amongst other information, the Technical Report summarizes the historical mineral resource estimates ("Historical Mineral Resources") for the Sherridon project. Historic Mineral Resources are quoted from five unmined deposits that are less than 8km apart, being the Park, Jungle, Bob, Cold and Lost prospects (see tables 1, 2 and 3 and figure 1). All prospects are interpreted to lie on the same mineralized horizon as the Sherritt Gordon East and West former mines.

Table 1: Aggregate Historical Mineral Resource Estimates for Jungle, Bob, Cold and Lost Prospects (Bloom et al., 2010)

INDICATED

Mining Method

Tonnes

Copper
(%)

Zinc
(%)

Gold
(g/t)

Silver
(g/t)

Copper
(M lbs)

Zinc
(M lbs)

Gold
(ozs)

Silver
(ozs)

Open Pit

5,317,000

0.80

1.23

0.34

7.2

94

144

58,800

1,233,400

Underground

1,235,800

1.04

1.18

0.48

8.2

28

32

19,200

325,300

Total Indicated

6,552,800

0.85

1.22

0.37

7.4

122

176

78,100

1,558,700

INFERRED

Open Pit

12,240,000

0.62

0.77

0.26

5.3

168

208

103,900

2,083,400

Underground

3,620,000

0.91

1.08

0.32

7.4

72

87

37,300

857,700

Total Inferred

15,860,000

0.68

0.84

0.28

5.8

240

294

141,200

2,941,100

 

Notes:

  1. The Historical Resource Estimates are based upon Bloom, L., Healy, T., Giroux, G., Halo Resources Ltd. 2010, Sherridon VMS Property, Technical Report NI43-101 - November 22, 2010, which is available at www.sedarplus.ca.

  2. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

  3. Mineral resources are estimated at a net smelter return (NSR) cut-off of US$20 per tonne and US$45 per tonne for open pit and underground respectively.

  4. Metal prices used are US$3.00/lb copper, US$1.05/lb zinc, US$1,000/oz gold and US$15.00/oz silver.

  5. Metallurgical recovery factors assumed were 92% for copper, 83% for zinc, 65% for gold and 57% for silver.

  6. The Mineral Resources are reported at a cut-off grade to reflect reasonable prospects for economic extraction, which were evaluated by designing a series of conceptual pit shells using the Lerchs-Grossman optimizing algorithm.

  7. Common values for operating costs and smelter terms were assumed.