Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Sun Summit Minerals Outlines Plans for 2025 Exploration Program at the JD Project, Toodoggone District, B.C.

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - November 26, 2024) - Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) is pleased to provide an overview of its upcoming 2025 project-wide exploration program at the JD Project, located in the Toodoggone Mining District, north-central British Columbia.

The Company plans to fully evaluate the significant high-grade and bulk-tonnage gold potential at the Creek and Finn Zones through targeted and infill drilling. Project-wide exploration activities are also planned to advance multiple new and existing high-priority targets.

Highlights:

  • Finn Zone Targeted Drilling: Drilling at the Finn Zone will include confirmation, infill, and step-out holes designed to potentially contribute to a future mineral resource estimate. Holes will evaluate the near-surface high-grade gold potential of target. Historical intercepts highlights include:

    • 35.7 m of 7.26 g/t Au including 1 m of 215.4 g/t Au (JD95-0472)

    • 22.0 m of 12.5 g/t Au including 0.8 m of 171.5 g/t Au (JD95-0642)

    • 25.9 m of 6.42 g/t Au including 6.1 m of 12.8 g/t Au (JD94-0151)

    • 22.0 m of 6.32 g/t Au including 12.6 m of 10.8 g/t Au (JD12-0033)

    • 27.8 m of 6.64 g/t Au including 11.0 m of 15.1 g/t Au (JD95-0972)

  • Creek Zone Step-Out and Infill Drilling: Drilling at the Creek Zone will include step-out and infill drilling designed to investigate the extent and continuity of high-grade and bulk-tonnage gold mineralization. Results may be used for a future mineral resource estimate. Historical and recent highlight intercepts include:

    • 122.53 m of 2.11 g/t Au including 1.5 of 121.0 g/t Au (CZ-24-0047)

    • 54.95 m of 2.69 g/t Au including 19.50 m of 7.31 g/t Au (CZ-24-0058)

    • 22.0 m of 11.7 g/t Au including 4.0 m of 61.2 g/t Au (CZ97-0085)

    • 21.5 m of 3.1 g/t Au including 3.0 m of 18.7 g/t Au (CZ98-0126)

  • Testing Additional Priority Targets: Project-wide exploration will also focus on:

    • Newly identified porphyry and epithermal targets including, Creek North, Belle North, and Fericrete targets.

    • Established high-priority epithermal targets across the Finn to Creek Corridor including MVT, JD West, Ag Carbonate, Wolf and Schmitt.

  • Geophysical and Geochemical Surveys: Additional Induced Polarization (IP) geophysical and soil geochemical surveys will be completed across multiple underexplored target areas including the eastern claim block with strong porphyry copper potential.

Sharyn Alexander, President of Sun Summit Minerals, commented "The results from our 2024 exploration program have provided us with a strong foundation to launch an aggressive follow-up campaign in 2025. Our upcoming exploration efforts will focus on systematically stepping out from known mineralized areas while continuing to test priority targets that could lead to additional high-grade discoveries. For shareholders and potential investors, this represents an opportunity to be part of a highly prospective exploration story in a world-class mining district."