Sun Summit Files NI 43-101 Technical Report for the Inaugural Mineral Resource Estimate on the Buck Project, Central B.C.

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - April 7, 2025) - Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) ("Sun Summit" or the "Company") is pleased to announce that it has filed an independent technical report (the "Technical Report") with a mineral resource estimate (MRE) as described more fully in the Technical Report and the Company's news release dated February 26, 2025.

The Technical Report titled "2025 Mineral Resource Estimate for the Buck Main Deposit NI 43-101 Technical Report", dated April 2, 2025 (effective date of January 28, 2025), has been prepared by Moose Mountain Technical Services, and is available on the Company's Website (https://sunsummitminerals.com/investors/presentations-downloads/) and on SEDAR+ (www.sedarplus.ca) under Sun Summit's issuer profile.

Highlights:

  • Inferred Mineral Resources at Buck Main are estimated to include 820,400 oz AuEq1 (775,500 oz gold and 8,435,000 oz silver) at a grade of 0.489 g/t AuEq1 (0.462 g/t Au, 5.0 g/t Ag) contained within 52.2 Mt.

  • Indicated Mineral Resources at Buck Main are estimated to include 19,100 gold equivalent ounces1 (oz AuEq) (18,300 oz gold and 158,000 oz silver) at a grade of 0.519 g/t gold equivalent1 (g/t AuEq) (0.496 g/t Au, 4.3 g/t Ag) contained within 1.15 million tonnes (Mt).

  • The near-surface Mineral Resource at Buck Main is constrained within an optimized open-pit shell using a 0.25 g/t AuEq cutoff, ensuring reasonable prospects for economic extraction.

  • Additional upside at Buck Main as the deposit remains open for expansion in most directions and at depth.

  • Effective discovery with average drill costs of CAD $18 per ounce of AuEq included in the MRE.

Notes:

1. Gold Equivalent (AuEq) grade is based on AuEq = Au + 0.0053*Ag (see notes to Table 1 below)

The Buck MRE is centered on the Buck Main deposit, 12 km south of Houston, BC. The road accessible deposit comprises a broad, 800 metre striking zone of intermediate-sulfidation epithermal-related gold-silver mineralization hosted in intermediate to felsic volcanics and intrusions. The MRE is based on 42,440 metres of drilling in 161 holes, of which 34,386 metres in 98 holes were completed by Sun Summit between 2020 and 2023 (Figures 1 and 2, Table 3).

Buck Main Mineral Resource Estimate

Table 1. Summary of Indicated and Inferred Mineral Resources for the Buck Main deposit

Class

AuEq
Cutoff

In Situ Tonnage and Grade

AuEq
Metal

Au
Metal

Ag
Metal

Tonnage

AuEq

Au

Ag

NSR

(gpt)

(ktonnes)

(gpt)

(gpt)

(gpt)

($CDN)

(kOz)

(kOz)

(kOz)

Indicated

0.25

1,148

0.519

0.496

4.3

40.40

19.1

18.3

158

Inferred

0.25

52,224

0.489

0.462

5.0

38.04

820.4

775.5

8,435