StrikePoint Provides Exploration Update on its Recently Acquired Hercules Gold Project, Walker Lane, NV

In This Article:

Visible Gold Documented in Three Separate Widely Spaced Locations

Vancouver, British Columbia--(Newsfile Corp. - September 24, 2024) - StrikePoint Gold Inc. (TSXV: SKP) (OTCQB: STKXF) ("StrikePoint" or the "Company") is pleased to provide an update the wholly owned Hercules Gold Project located in Nevada's Walker Lane approximately 20km east of the Comstock Lode where historically 14 million oz of gold were produced.

Michael G. Allen, President and CEO of StrikePoint commented, "One of the significant outstanding features of the Hercules Gold Project is the scale of the gold and the scale of the property. Visible gold has been documented at surface at three separate widely spaced locations. Additionally, previous geophysical surveys indicate the presence of an extensive alteration zone that is approximately 13 km long and 6 km wide that is coincident with the known mineralization, all of this is contained within the 100 square kilometer property."

The project's acquisition by StrikePoint was announced September 3, 2024.

Hercules Gold Project Geology:

The Hercules Gold Project features a large-scale low-sulphidation epithermal gold target. Potentially economically significant gold grades/thicknesses have been intercepted by multiple operators with over 300 drillholes over a large area suggesting a strong gold mineralizing system. Drilling has largely been focussed on the northern portion of the property focussed on 5 target areas: Hercules, Cliffs, Loaves, Northeast and Rattlesnakes. These targets can now be drilled under an existing Plan of Operations exploration permit. Additional targets, Sirens and Como Comet can be drilled under two Notice of Intent Permits

Figure 1 Hercules Gold Project targets and surface samples

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/5044/224299_c66d9d1ff4cdfb97_002full.jpg

Extensional structures appear to have been the primary conduits along which gold and silver mineralization was emplaced into the volcaniclastic sequence on the Hercules Gold Project. Broad zones of disseminated gold mineralization appear to have been formed where the metal bearing structures have intersected permeable units (e.g., block-and-ash tuff) in the volcaniclastic sequence. Mineralization has largely been oxidized with local relicts of transitional mineralization remaining.

Hercules Target:
The Hercules target is the southeastern most of the targets available for drilling under the existing Plan of Operations. It is one of the three locations on the Project that visible gold has been documented in surface samples.