SPC Nickel Intersects 0.83% Nickel and 0.19% Copper over 14.7 metres at the West Graham Project, Sudbury, Ontario

In This Article:

SUDBURY, ON, Oct. 1, 2024 /CNW/ - SPC Nickel Corp. (TSXV: SPC) ("SPC Nickel" or the "Company"), is pleased to announce additional diamond drill results from the ongoing 2024 Drill Program at the Company's West Graham Project ("West Graham" or "the Project") located in the world-class nickel-copper mining district of Sudbury, Ontario (Figure 1).

Assay results from an additional 7 holes have been received and are reported here. To date, assay results for 19 (1,152 metres) of the 33 holes (2,240 metres) completed have been received and reported. Significant results are presented below in Table 1. A summary table of drill results from the 2024 Drill Program at West Graham may be found on our website, here.

Highlights:

  • Hole WG-24-101, intersected 0.83% Ni and 0.19% Cu over 14.7 metres from 35.0 to 49.7 metres. This interval is part of a wider interval that returned 0.53% Ni and 0.18% Cu over 44.0 metres from 14.0 to 58.0 metres (Table 1).

  • Hole WG-24-102, intersected 1.59% Ni and 0.15% Cu over 3.0 metres from 16.5 to 19.5 metres. This interval is part of a wider interval that returned 0.65% Ni and 0.29% Cu over 30.0 metres from 13.5 to 43.5 metres (Table 1).

Grant Mourre, CEO and President of SPC Nickel commented, "Since the publication of our Mineral Resource Estimate, SPC Nickel has remained focused on upgrading and expanding the potential we see at West Graham. Our original thesis has remained unchanged in so far as we believe we have a high-quality, near surface resource, close to infrastructure in the heart of the world's leading nickel district, representing a significant economic opportunity. These latest results continue to reinforce our confidence in the geologic and economic potential of the West Graham Project, and we will continue to advance this strategic asset. The SPC Nickel team is committed to a rigorous and methodical exploration process at West Graham that will ultimately deliver exceptional value to our shareholders."

Assay Results

Table 1: New assay results from the 2024 drill program on the West Graham Project.

HOLE ID

From
(m)

To
(m)

Length
(m)1

Ni
(%)

Cu
(%)

Co
(%)

Pt
(g/t)

Pd
(g/t)

Au 
(g/t)

Ag 
(g/t)

Estimated
True
Width %

WG-24-098

1.00

33.00

32.00

0.51

0.31

0.02

0.06

0.02

0.02

1.53

100

including

20.00

29.00

9.00

0.72

0.37

0.02

0.08

0.02

0.02

1.78

100

WG-24-099

7.00

48.00

41.00

0.46

0.21

0.02

0.04

0.02

0.01

1.00

95

including

37.00

43.00

6.00

0.88

0.21

0.03

0.06

0.02

0.01

1.15

95

WG-24-100

11.30

46.00

34.70

0.35

0.19

0.01

0.03

0.01

0.02

1.24

95

including

37.00

43.00

6.00

0.64

0.31

0.02

0.07

0.02

0.03

1.95

95

WG-24-101

14.00

58.00

44.00

0.53

0.18

0.02

0.04

0.01

0.01

1.28

95

including

35.00

49.70

14.70

0.83

0.19

0.03

0.05

0.02

0.01

1.52

95

WG-24-102

13.50

43.50

30.00

0.65

0.29

0.02

0.03

0.02

0.02

1.79

75

including

16.50

19.50

3.00

1.59

0.15

0.06

0.04

0.02

0.004

1.79

75

WG-24-103

15.00

36.00

21.00

0.24

0.16

0.01

0.02

0.01

0.01

1.06

95

WG-24-104

33.00

49.50

16.50

0.33

0.18

0.01

0.02

0.01

0.01

1.01

100

Notes: 1. Length refers to downhole length. Estimated True Width is expressed as a percentage of downhole length.