Unlock stock picks and a broker-level newsfeed that powers Wall Street. Upgrade Now
SPARTAN DELTA CORP. ANNOUNCES OPERATIONS UPDATE

In This Article:

CALGARY, AB, Jan. 6, 2025 /CNW/ - Spartan Delta Corp. ("Spartan" or the "Company") (TSX: SDE) is pleased to provide an operations update following the successful completion of its 2024 drilling program.

Spartan Delta Corp. logo (CNW Group/Spartan Delta Corp.)
Spartan Delta Corp. logo (CNW Group/Spartan Delta Corp.)

OPERATIONS UPDATE

Spartan continues to execute on its corporate strategy by significantly growing oil and liquids production and acreage in the West Shale Basin Duvernay (the "Duvernay"), focusing on improving well costs and productivity, while leveraging its technical expertise in the Deep Basin to optimize operations, growing production as it continues to develop liquids-rich targets. In the fourth quarter of 2024, Spartan averaged estimated production of approximately 38,523 BOE/d (35% liquids), exceeding forecasted production. Spartan's crude oil and condensate production increased approximately 72% when compared to the fourth quarter of 2023. The Company's portfolio of assets provides shareholders exposure to oil, liquids, and natural gas production and is poised to offer repeatable and economic results presenting the opportunity to generate significant shareholder returns.

Spartan anticipates providing additional details regarding its preliminary 2025 operating budget and guidance on or before the release of its annual results for 2024.

DUVERNAY

To date in the Duvernay, Spartan has successfully drilled 4.0 (3.4 net) wells, including a vertical stratigraphic well, and has completed and brought on-stream 4.0 (3.4 net) wells including an existing drilled, but uncompleted well ("DUC"), all in the Willesden Green Duvernay ("Willesden Green"). Spartan is encouraged by the Duvernay as initial results have outperformed internal expectations.

In the fourth quarter, Spartan completed and brought on-stream 2.0 (1.4 net) wells from a licensed eight well pad at 05-18-042-03W5:

  • 03-26-042-04W5 Spartan completed and brought the well on-stream in November at a lateral length of 3,560 meters (11,680 feet). Initial production results are exceeding internal expectations, averaging 30-day peak sales production of approximately 1,166 BOE/d and 90% liquids (1,019 BBL/d of 48° API crude oil, 28 BBL/d of NGLs, and 0.7 MMcf/d of natural gas).

  • 09-05-042-03W5 Spartan completed and brought the well on-stream in November at a lateral length of 3,720 meters (12,200 feet). Initial production results are exceeding internal expectations, averaging 30-day peak sales production of approximately 1,029 BOE/d and 87% liquids (865 BBL/d of 48° API crude oil, 31 BBL/d of NGLs, and 0.8 MMcf/d of natural gas).