Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Solid operational performances in H1 2024 and a favourable outlook for manganese ore prices

In This Article:

Eramet SA
Eramet SA

Paris, 25 July 2024, 6:30 p.m.

PRESS RELEASE

Solid operational performances in H1 2024 and a favourable
outlook for manganese ore prices

  • Good operational performance of the Group’s main mining activities in H1 2024 (vs. H1 2023):

    • +33% in manganese ore volumes produced (vs. H1 2023), with a return to normal operating conditions

    • +40% in nickel ore volumes produced in Indonesia; albeit with -20% in volumes sold, reflecting the absence of low-grade saprolite sales’ permit

    • +33% in volumes of mineral sands produced

  • Strong decline in nickel selling prices and lower manganese ore selling prices (index rebound not yet fully materialised in Q2)

  • Negative contribution from SLN, with no impact on Eramet’s balance sheet thanks to new financing from the French State 

  • Adjusted EBITDA1 at €247m (including -€109m2 for SLN), down 27% in H1 2024 (vs. H1 2023) factoring in a strongly negative price effect over the period (-€304m); positive intrinsic performance (+€216m)

  • Net income, Group share negative at -€41m (including -€72m for SLN)

    • Negative Free Cash-Flow owing to continued growth capex. Slight increase in net debt to €711m and adjusted leverage3 of 1x; maturity extended by 1 year

  • Inauguration of the Group’s first direct lithium extraction plant in Argentina

    • Implementation of the new CSR roadmap, “Act for positive mining”, with further delivery progress, particularly in terms of employee social protection solutions

  • Outlook set against a favourable price environment for manganese ore: to date, market consensus is $8.9/dmtu in H2, (+66% vs. H1), leading to $7.3/dmtu over the year

    • Range adjusted for volume growth targets over the year:

      • Manganese ore transported in Gabon: between 7.0 and 7.5 Mt

      • Marketable nickel ore at Weda Bay: between 40 and 42 Mwmt4, given that the permit was not granted for low-grade saprolite sales

  • Lithium carbonate produced at Centenario: around 1 kt-LCE, with production scheduled to start in November

  • Financial performance in H2 expected to be significantly above that of H1, owing to favourable seasonality for mining activities and the price scenario. Calculated based on the Group's volume target range and based on the indicative price consensus to date for the year, adjusted EBITDA would be positioned, for illustrative purposes, between €1.2bn and €1.3bn in 2024

  • 2024 capex plan revised downwards: between €550m and €600m5 financed by the Group

Christel Bories, Group Chair and CEO:

"We achieved a good operational performance in the first half of the year, with normal operating conditions in Gabon and strong growth in production in Indonesia.