Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Snowline Gold Drills Mineralization 300 M Beyond Current Resource in Expansion Drilling at The Valley Deposit, Rogue Project, And Demonstrates District Potential with Intersection Of 20.9 Grams Per Tonne Gold Over 2.1 M At Its Jupiter Target, Einarson Project, Yukon

In This Article:

  • Resource Expansion Potential at Valley: Hole V-24-115 intersects 2.08 g/t Au over 15.5 m within a broader 100.5 m intersection averaging 0.53 g/t Au, showing strong mineralization in an unexplored part of the Valley intrusion over 300 m east of the Valley deposit, Rogue Project

  • Continuity Confirmed: Hole V-24-117 intersects 1.64 g/t Au over 112.5 m within a broader 242.5 m intersection averaging 1.14 g/t Au, demonstrating strong continuity of the Valley Deposit

  • District Potential Demonstrated: Einarson Project hole J-24-031 returns 20.94 g/t Au over 2.1 m within 9.45 m of 6.81 g/t Au at the Jupiter target, expanding mineralization 50 m to depth (open) and advancing understanding of structural controls

  • Drilling Update: Assays remain pending for >2,500 m from 6 holes from infill and expansionary drilling at Snowline's Valley deposit, Rogue Project.

VANCOUVER, BC / ACCESS Newswire / February 19, 2025 / SNOWLINE GOLD CORP (TSX-V:SGD)(OTCQB:SNWGF) (the "Company" or "Snowline") is pleased to announce further results from its 2024 drill campaign on the Valley deposit, Rogue Project, and from its Jupiter target on the adjacent Einarson Project, Yukon. At Valley, holes V-24-114 and V-24-115 both returned intervals of strong gold mineralization outside of the existing MRE, demonstrating the presence of gold within a large and still untested part of the Valley intrusion. Additional holes V-24-116 and V-24-117 show continuity of >1 g/t gold grades along multiple edges of the primary deposit area at Valley. These results will help to inform an updated MRE for Valley anticipated in the coming months. At Jupiter, roughly 30 km north of Valley on the adjacent Einarson Project, three of four reported holes intersected >8 g/t Au mineralization, with an interval of 20.9 g/t Au over 2.1 m (~true width) in J-24-031 confirming a secondary east-west structural control on mineralization that could assist with future targeting at Jupiter and regionally. Results are pending for an additional >2,500 m of drilling in six holes from infill and expansionary drilling at the Valley deposit, Rogue Project.

Table 1 -Highlight summary of Snowline's latest assay results; see Tables 2 (Valley) and 3 (Jupiter) for details. *Interval widths reported.

"The near-surface, high-grade part of the Valley intrusion that hosts Snowline's Valley gold deposit rightfully commands a lot of attention," said Scott Berdahl, CEO & Director of Snowline. "Today's results from other parts of the Valley intrusion and from the separate Jupiter target are both great reminders that the Valley deposit was not created in a vacuum, but rather as a product of target-scale and regional-scale geological processes underpinned by gold fertility of the eastern Selwyn Basin. Hole V-24-115 highlights the potential of the Valley intrusion itself-outside of the current Valley deposit-to host additional zones of high-grade gold mineralization. Roughly 30 km to the north, at our Jupiter target, the grades seen in J-24-031 are encouraging and further enhance our understanding of this structurally-controlled system. Both results support Snowline's founding conviction that a previously unrecognized gold district could exist within our project boundaries in the eastern Yukon Territory.

Waiting for permission
Allow microphone access to enable voice search

Try again.