Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Skyharbour Commences its 2025 Drilling Campaign with Winter Drilling Program at its Russell Lake Uranium Project, Saskatchewan

In This Article:

Skyharbour Resources Ltd
Skyharbour Resources Ltd

Vancouver, BC, Feb. 25, 2025 (GLOBE NEWSWIRE) -- Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt: SC1P) (“Skyharbour” or the “Company”) is pleased to announce the commencement of its winter phase of diamond drilling at the 73,314 hectare Russell Lake Uranium Project (“Russell” or the “Project”). The Project is 57.7% owned by Skyharbour as operator with joint-venture partner Rio Tinto Exploration Canada Inc. (“RTEC”) owning the other 42.3%. It is strategically located in the central core of the Eastern Athabasca Basin of northern Saskatchewan, with access to regional infrastructure, including an all-weather road and powerline. Skyharbour plans to complete an initial 5,000-metre diamond drilling program in 10 to 12 holes at the project, building on the successful results from the drilling campaign completed last year. The Company's geologists, along with a contracted drilling crew, are based at Skyharbour’s exploration camp on the McArthur River-Key Lake haul road, situated within five kilometres of Denison Mines' Phoenix deposit at the Wheeler River Project.

Russell Lake and Moore Projects Location Map:
https://www.skyharbourltd.com/_resourceshttps://finance.yahoo.com/images/SKY_RussellLake.jpg

Skyharbour is fully-funded for its upcoming drill programs at its co-flagship Russell Lake and Moore Uranium Projects in 2025 starting with this first phase of drilling at Russell. The Company has plans to drill approx. 16,000 – 18,000 metres in 35 – 45 holes across its co-flagship projects representing the largest annual drill campaign ever carried out by the Company.

Jordan Trimble, President and CEO of Skyharbour, stated: “We are thrilled to commence the 2025 drill campaign which will consist of 16-18,000 metres in multiple phases of drilling at Russell and Moore throughout the year. This will provide steady news flow as we follow up on the 2024 programs with the benefit of low-cost drilling and relatively shallow target depths at our co-flagship projects. This first phase of drilling at Russell will continue to test the exploration upside at the project, which hosts widespread uranium mineralization and has the geology necessary for larger, high-grade, Athabasca Basin uranium deposits.”

Winter Phase of Diamond Drilling at Russell Lake:

Skyharbour has commenced its 2025 drilling program at the Russell Lake Project with plans for a first phase consisting of approx. 5,000 metres to follow up on notable recent exploration success and to test new targets developed by the geological team. The focus for this phase of drilling will be on the Fork and Sphinx targets within the broader Grayling target area, as well as the M-Zone Extension (“MZE”) target and the Fox Lake Trail target. This initial winter program will consist of 10 to 12 drill holes, with most of the targets being road accessible and near the exploration camp, bringing the drill costs down. Furthermore, details on the geochemical assay results are pending from the drilling carried out in late 2024 at Russell.