Sitka Prepares for Winter Diamond Drilling Program at Its RC Gold Project, Yukon

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - February 4, 2025) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQB: SITKF) ("Sitka" or the "Company") is pleased to announce that preparations are currently underway for a winter diamond drilling program scheduled to begin this month at its flagship RC Gold Project ("RC Gold" or the "Project"), located in the prolific Tombstone Gold Belt in Yukon. The winter drilling campaign will mark the start of a fully funded 30,000 metre diamond drilling program planned for RC Gold this year.

The Company recently announced an updated mineral resource estimate ("MRE") at RC Gold of 1.3 million ounces of gold indicated and 1.5 million ounces of gold inferred (see news release dated January 21, 2025 and Table 1). The MRE includes updated gold resource estimates at its 100% owned Blackjack deposit comprised of an indicated resource of 1.29 million ounces at a grade of 1.01 g/t gold and an inferred resource of 1.04 million ounces at a grade of 0.94 g/t gold using a 0.30 g/t gold cut-off grade. The primary focus of drilling this year will be to continue upgrading and expanding the Blackjack deposit, which remains open in all directions, and further test gold mineralization within the Clear Creek Intrusive Complex (CCIC), including at the Eiger Deposit, which also remains open in all directions, and at the Saddle, Rhosgobel, Contact and Pukelman targets (see Figures 1 and 2). In late 2024, the Company completed the first ever diamond drill holes at Rhosgobel which significantly increased the depth of known gold mineralization at the target area with gold mineralization now extending from surface to a depth of at least 300 metres. Two holes were completed and returned multiple observations of visible gold and impressive intervals of strong gold mineralization with assays of up to 119.0 m of 1.05 g/t gold including 37.9 m of 2.05 g/t gold and 11.5 m of 4.32 g/t gold (see news release dated November 25, 2024).

"We are very excited to begin preparations for our 2025 diamond drilling program at RC Gold where we plan to get a significant jump on this year's drilling season with a winter drilling program", stated Cor Coe, Director and CEO of Sitka. "Since 2022, and with limited drilling, we have taken RC Gold from an initial discovery hole to a very impressive gold resource that has the potential to grow considerably. With 30,000 metres of drilling planned for 2025, which is more than double the total amount of drilling that we have completed to date at the Project, we are on track to rapidly advance RC Gold this year with significant expansion drilling at the Blackjack and Eiger deposits as well as follow up drilling at the other intrusion-related gold targets within the Clear Creek Intrusive Complex, including the Rhosgobel and Pukelman intrusions where drilling last year confirmed robust gold mineralization is present similar to that observed at the Blackjack deposit."