SCOTTIE RESOURCES INTERCEPTS 8.78 G/T GOLD OVER 9.00 M AND 12.2 G/T OVER 3.47 M AT BLUEBERRY CONTACT ZONE

In This Article:

VANCOUVER, BC, Oct. 24, 2024 /PRNewswire/ - Scottie Resources Corp. ("Scottie" or the "Company") (TSXV: SCOT) (OTCQB: SCTSF) (FSE: SR8) is pleased to report new assays on the Scottie Gold Mine Project in British Columbia's Golden Triangle, including several high-grade intercepts on the Road, Fifi, and Lemoffe vein zones along the Blueberry Contact. The Scottie Gold Mine Project, which includes the 100% owned historic mine, and the adjacent Blueberry Contact Zone, is located 35 kilometres north of the town of Stewart, BC, along the Granduc Road.

Highlights:

  • BCZ – Fifi / Lemoffe vein zone drillhole SR24-321 intersected 8.78 grams per tonne (g/t) gold over 9.00 metres (m) including 30.9 g/t gold over 1.00 m and intersected 12.2 g/t gold over 3.47 m (Table 1, Figures 2,3)

  • BCZ – near surface Road vein zone drillhole SR24-320 12.0 g/t gold over 2.70 m at a vertical depth of 17.5 m

  • BCZ - Blueberry vein zone drillhole SR24-317 intersected 6.87 g/t gold over 4.00 m in a wider zone of 2.95 g/t gold over 14.31 m (Table 1, Figures 2,3)

  • These new assays represent the first results from the 10,000 m 2024 drill program, additional results will be released as they are received

President and CEO, Brad Rourke commented: "Initial results from this season's 10,000 metre program continue to expand our Blueberry and D Zone targets. We look forward to including these and the forthcoming results into our maiden resource, which we expect to be able to release in early Q2 2025."

Table 1: Selected results from new drill assays (uncut) from the Blueberry Contact Zone (BCZ).

Drill Hole


From
(m)

To

(m)

Width*
(m)

Gold
(g/t)

Silver
(g/t)

Zone

SR24-317


247.69

262.00

14.31

2.95

1.45

BCZ - Road /
Blueberry

including

247.69

248.70

1.01

12.8

7.00

and including

258.00

262.00

4.00

6.87

9.00

SR24-319


188.00

189.30

1.30

1.06

83

BCZ – Lakebed Gap

SR24-320


19.15

21.85

2.70

12.0

1.96

BCZ - Road

SR24-321


87.00

96.00

9.00

8.78

37.00

BCZ - Fifi / Lemoffe

including

88.00

93.00

5.00

13.1

4.40

and including

92.00

93.00

1.00

30.9

7.00


168.98

172.45

3.47

12.2

3.85

including

170.00

171.20

1.20

24.2

8.00

SR24-322


132.20

136.50

4.30

1.89

4.30

BCZ - Lakebed

SR24-324


215.00

216.00

1.00

7.10

8.00

D Zone


223.00

224.00

1.00

2.46

55.00

SR24-325


72.50

73.50

1.00

4.22

45.00

BCZ - Gully


83.00

85.00

2.00

3.36

6.50


113.70

114.70

1.00

1.53

9.00

SR24-326


147.00

148.00

1.00

1.25

2.00

D Zone


200.90

202.00

1.10

5.52

3.00

SR24-328


14.00

16.00

2.00

1.05

0.00

D Zone

*True width of the intervals has not yet been established by drilling