Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Sandstorm Gold Royalties Portfolio Drilling and Development Highlights

In This Article:

VANCOUVER, BC, March 12, 2025 /PRNewswire/ - Sandstorm Gold Ltd. ("Sandstorm Gold Royalties", "Sandstorm" or the "Company") (NYSE: SAND) (TSX: SSL) is pleased to provide various developments and exploration highlights within its diversified stream and royalty portfolio (dollar figures in USD unless otherwise indicated).

Sandstorm Gold Royalties Logo (CNW Group/Sandstorm Gold Ltd.)
Sandstorm Gold Royalties Logo (CNW Group/Sandstorm Gold Ltd.)

Erdene Secures Working Capital for Bayan Khundii Commissioning; First Gold Expected Mid-2025

Erdene Resource Development Corp. ("Erdene") has secured a $50 million working capital facility provided by the Development Bank of Mongolia, which will fund pre-mining and commissioning activities of the Bayan Khundii gold project in Mongolia. In December 2024, Erdene reported construction progress at the process plant and critical non-process infrastructure buildings. Mechanical and electrical works are expected to be complete in the first quarter of 2025 followed by commissioning and pre-production mining in the second quarter. Erdene expects first gold produced at Bayan Khundii in mid-2025 and commercial production in the third quarter.

For more information, visit Erdene's website at www.erdene.com and see the press release dated December 10, 2024. Sandstorm has a 1.0% net smelter returns ("NSR") royalty on the Bayan Khundii project.

8.5 Metres of 173 g/t Gold Intersected at Fruta del Norte; Copper-Gold Mineralization Discovered at New Trancaloma Target

Subsequent to the release of the updated Mineral Resource Estimate ("MRE") at the Fruta del Norte mine ("FDN") in Ecuador, Lundin Gold Ltd. ("Lundin Gold") has released additional drill results from its ongoing near-mine exploration program. The results include the highest-grade intercepts ever reported at the FDN South deposit ("FDNS") as well as early-stage results at the new Trancaloma copper-gold target located less than one kilometre east of the Bonza Sur deposit. Drilling east of the FDN deposit ("FDN East") also confirmed continuity of gold mineralization, including the widest mineralized interval at FDN East to date. All drill results reported by Lundin Gold at FDNS, FDN East, and Trancaloma are included within the area of interest of Sandstorm's precious metals royalty.

Highlighted drill results include (not true widths):

FDNS

  • UGE-S-24-212: 173.98 grams per tonne ("g/t") gold over 8.45 metres from 77.60 metres, including 572.47 g/t gold over 2.50 metres;

  • UGE-S-24-213: 77.31 g/t gold over 10.90 metres from 94.80 metres, including 394.78 g/t gold over 2.10 metres;

  • UGE-S-24-185: (included in 2024 MRE) 49.86 g/t gold over 7.80 metres from 59.00 metres, including 83.48 g/t gold over 4.50 metres.