Results Reported for Definition Drilling at AurMac Gold Project, Yukon
ACCESSWIRE · Eagle Royalties Ltd.

In This Article:

CRANBROOK, BC / ACCESSWIRE / November 6, 2024 / Eagle Royalties Ltd. (CSE:ER.CN), or "Eagle Royalties") has learned of encouraging drill hole intercepts, including visible gold, at the AurMac project in central Yukon in a recent public announcement made by Banyan Gold Corp. on November 4th, 2024 (see Nov 4th BYN news release here). Banyan earlier announced results for AurMac in a news release issued September 5th 2024 (see Sept 5th BYN news release here). Eagle Royalties holds royalty interests ranging from 0.5% to 2.0% on certain claims which comprise a portion of the AurMac project. See additional AurMac royalty information here

According to the announcements, Banyan has reported results for 13 holes which appear to be drilled in the Powerline resource area on mineral claims subject to a 1% net smelter return royalty held by Eagle Royalties. The reported results for the 13 holes are as follows:

Highlight AurMac Assay Results Relating to Eagle Royalties*:

  • AX-24-519: 138.7m grading 0.52 g/t gold ("Au") from 6.1m-visible gold reported

  • AX-24-520: 98.1m grading 0.72 g/t Au from 33.7m-visible gold reported

  • AX-24-521: 111.4m grading 0.52 g/t Au from 45.5m

  • AX-24-522: 184.3m grading 0.60 g/t Au from 24.9m-visible gold reported

  • AX-24-523: 62.0m grading 0.35 g/t Au from 21.3m

  • AX-24-524: 197.0m grading 0.72 g/t Au from 10.5m

  • AX-24-534: 48.0m grading 0.53 g/t gold from 75.1m-visible gold reported

  • AX-24-537: 37.4m grading 0.33 g/t gold from 85.1m

  • AX-24-540: 0.2m grading 539.30 g/t from 166.1m

and 56.7m grading 0.36 g/t gold from 166.3m-visible gold reported

  • AX-24-542: 154.1m grading 0.58 g/t gold from 18.3m-visible gold reported

  • AX-24-544: 0.3m grading 290.10 g/t gold from 37.1m

and 30.3m grading 0.37 g/t gold from 146.2m-visible gold reported

  • AX-24-545: 78.6m grading 0.41 g/t gold from 74.9m

  • AX-24-548: 79.6m grading 0.56 g/t gold from 26.5m

*true widths are estimated to be approximately 90% of drilled intervals

The above technical information relating to drill collar location and analytical results has been taken directly from the Banyan Gold news releases dated September 5th 2024 and November 4th 2024. More detailed drilling information, analytical procedures and results are available in the full news releases issued by Banyan. Eagle Royalties management believes that although the reported true thickness estimates and drill collar location coordinates are accurate, it cautions that ER does not have detailed geological data or final surveyed locations of the drill hole traces in relation to the claims that are underlain by the ER royalty interests.