Quarterly Production Summary & Operations Update

Vast Resources plc / Ticker: VAST / Index: AIM / Sector: Mining

16 October 2017
Vast Resources plc
("Vast" or the "Company")

Quarterly Production Summary & Operations Update

Vast Resources plc, the AIM listed mining company with operations in Romania and Zimbabwe, presents its operational update and production summary for the three months ended 30 September 2017 (`Q3 2017`).

To view a presentation, which presents the Q3 2017 results together with the previous four quarters, please visit the Company`s website: www.vastresourcesplc.com.

Production Overview:

Q3 2017 was a record quarter for Vast, which saw operations at the Manaila Polymetallic Mine in Romania ("Manaila") and the Pickstone-Peerless Gold Mine in Zimbabwe ("Pickstone-Peerless") outperform the previous quarter in terms of tonnes mined, tonnes milled, copper concentrate produced and gold produced.

Manaila Production Summary
(commissioned on 14 August 2015, Vast interest 100%.):

Results for the quarter demonstrate a considerable improvement over Q2 2017. In respect of volume related metrics, Q3 2017 reflects an exceptional performance. This result is unsurpassed since commissioning of the mine by Vast.

Summary of Q3 2017 Production:

  • 46% increase in tonnes of ore mined from Q2 2017 to 40,462 dry tonnes

(Q2 2017: 27,707 dry tonnes*)

  • 39% increase in tonnes of ore milled from Q2 2017 to 39,135 dry tonnes

(Q2 2017: 28,082 dry tonnes*)

  • 31% increase in copper concentrate produced from Q2 2017 to 1,082 dry tonnes (Q1 2017: 828 dry tonnes)

  • 2% decrease in copper concentrate grade from Q2 2017 to 17.9%

(Q2 2017:18.2%)

  • 25% decrease in zinc concentrate produced from Q2 2017 to 118 dry tonnes (Q2 2017: 157 dry tonnes)

  • 6% increase in zinc concentrate grade from Q2 2017 to 42.3% (Q2 2017: 39.8%)

  • 50% increase in gold concentrate from Q2 2017 to 7dry tonnes (Q2 2017: 5 dry tonnes)

  • 30% decrease in gold concentrate grade from Q2 2017 to 31.4g/t (Q2 2017: 45g/t)

Pickstone-Peerless Production Summary
(commissioned on 20 August 2015, Vast interest 25%):

Ore mined and milled at Pickstone-Peerless rose in the quarter to their highest levels since the June 2016 quarter. Operations are being managed at maximum milling capacity ahead of commissioning of the new sulphide plant.

  • 4% increase in tonnes of ore mined from Q2 2017 to 71,553 tonnes (Q2 2017: 68,659 tonnes)

  • 16% increase in tonnes of ore milled from Q2 2017 to 68,431 tonnes (Q2 2017: 58,923 tonnes)

  • 17% increase in gold production from Q2 2017 to 4,738 ounces (Q2 2017: 4,037 ounces)

  • 3% increase in milled gold grade from Q2 2017 to 2.41g/t (Q2 2017: 2.35g/t)