Q2 Metals Expands Major Lithium Zone at the Cisco Lithium Project: Hole 27 Drilled 179.6 Metres at 1.66% Li₂O, 58.0 Metres at 1.75% Li₂O, and 91.8 Metres at 1.81% Li₂O

In This Article:

Q2 Metals Corp
Q2 Metals Corp

Highlights:

  • Assay results from four (4) drill holes from the 2025 Winter Program at the Cisco Lithium Project with strong analytical results are reported herein, including:

    • CS25-027: Three major intervals:

      • 179.6 m at 1.66% Li2O;

      • 58 m at 1.75% Li2O; and

      • 91.8 m at 1.81% Li2O.

    • CS25-024A: Widest interval of 39.5 m at 1.16% Li2O.

    • CS25-025: Widest interval of 29.0 m at 1.10% Li2O.

    • CS25-026: Widest interval of 23.9 m at 1.46% Li2O.

  • Assays for the 10 remaining drill holes from the winter program are pending.

VANCOUVER, British Columbia, May 27, 2025 (GLOBE NEWSWIRE) -- Q2 Metals Corp. (TSX.V: QTWO | OTCQB: QUEXF | FSE: 458) (“Q2” or the “Company”) is pleased to report initial assay results from the Winter 2025 drill program (the “2025 Winter Program”) at the Company’s Cisco Lithium Project (the “Project” or the “Cisco Project”), located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada.

A total of 6,980 metres (“m”) was drilled over 14 drill holes during the 2025 Winter Program at the Cisco Project, with the analytical results reported herein representing 2,381 m of drilling over the first four (4) holes.

Hole CS25-027 (“Hole 27”) was a large step out designed to test the continuity of the main mineralized zone to the south and was collared 430 m south of previously drilled hole CS24-023 (“Hole 23”), which contained a wide interval of 188.6 m of continuous spodumene pegmatite at 1.56% Li2O (as announced December 9, 2024). The intervals of Hole 27 are located 200 m to the south of the intervals of Hole 23, thus successfully confirming and extending the continuity of the wide mineralized zone to the south to approximately one-kilometre in length. Collectively, the three intervals in Hole 27 add up to being the best hole of the Cisco Project in terms of grade multiplied by width.

Complete highlighted intervals from drill holes CS25-024A to CS25-027 are summarized in Table 1 and represented in Figures 1 and 2.

Figure 1. Map of Recent Drill Holes with Analytical Results at Cisco Property
Figure 1. Map of Recent Drill Holes with Analytical Results at Cisco Property


Figure 1. Map of Recent Drill Holes with Analytical Results at Cisco Property

“We are extremely pleased with the exploration progress made during our 2025 Winter Program,” said Alicia Milne, Q2 Metals CEO and President. “Our team designed large step outs from the main mineralized discovery zone to test additional outcrops, and the confirmation that the mineralization continues over one kilometre to the south further cements Cisco’s position as a discovery with world class potential. The 2025 summer exploration program is underway, with crews at site conducting field exploration activities. A fully funded drill campaign is expected to start in late June, with more details to follow.”