Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Purepoint Uranium Hits 1.3 Metres of 53.5% U3O8 Within 10.0 Metres of 10.3% U3O8 With Last Hole of Winter 2016 Drilling at the Spitfire Zone

TORONTO, ONTARIO--(Marketwired - Apr 21, 2016) - Purepoint Uranium Group Inc. (the "Company" or "Purepoint") (TSX VENTURE:PTU) today reported the strongest uranium mineralization drilled to date within the Spitfire Zone intersected by hole HK16-53 returning an assay result of 53.3% U3O8 over 1.3 metres within a 10.0 metre interval that assayed 10.3% U3O8. Purepoint is the operator of the Hook Lake project on behalf of its Joint Venture partners Cameco Corp. and AREVA Resources Canada Inc.

The HK16-53 mineralized intercept is situated only 220 metres below surface and is approximately 10 metres east of the HK16-43 mineralization.

"The structure hosting the shallow, high-grade uranium at Spitfire remains open in most directions," said Scott Frostad, V.P. Exploration at Purepoint. "This winter's program further defined the structural controls of the Spitfire mineralization allowing us to anticipate further success as we continue to test the mineralized structure along strike and to depth."

Highlights:

  • Spitfire Zone drill hole HK16-53 has returned assay results of 10.3% U3O8 over 10.0 metres and includes 53.5% U3O8 over 1.3 metres;

  • Geochemical assays for all remaining holes drilled at Spitfire during the 2016 Winter drill season are provided in this release including drill hole HK16-43 with grades returning as high as 40.3% over 0.3 metres;

  • A budget for ground geophysics over the Spitfire zone and the area immediately north has been approved by the Hook Lake JV pending the review of the drill results at next month's Technical Committee meeting; and

  • Details of the Hook Lake summer exploration program and regional drill results will be provided in the coming weeks.

Spitfire Assay Results

Drill Hole ID

From (m)

To (m)

Width (m)

%U3O8

HK16-43

225.8

233.0

7.2

0.71

236.9

241.6

4.7

1.19

244.5

247.6

3.1

4.07

Inc.

245.2

245.5

0.3

40.3

250.3

253.4

3.1

0.14

262.4

262.7

0.3

0.15

HK16-47

194.5

205.6

11.1

0.17

216.5

236.6

20.1

0.88

Inc.

220.6

224.5

3.9

2.31

HK16-49

222.9

224.1

1.2

0.27

239.9

241.8

1.9

1.24

245.0

245.5

0.5

0.08

251.1

253.5

2.4

0.77

HK16-51

332.7

338.5

5.8

0.13

HK16-52

197.2

199.3

2.1

0.17

232.5

250.0

18.1

0.74

Inc.

248.9

250.0

1.1

6.82

HK16-53

231.7

232.6

0.9

0.08

237.6

247.6

10.0

10.3

Inc.

243.9

245.2

1.3

53.5

HK16-54

369.2

370.2

1.0

1.16

Note: Reported uranium grades are composited by length using a cut-off of 0.05% U3O8 and maximum internal dilution of 2.0 metres. Down-hole thickness are reported; true width varies depending on drill hole dip; most 2016 drill holes were aimed at intersecting the mineralized structures close to perpendicular therefore true width are close to down hole width (approximately 65% to 75% ratio)

Assay results for HK16-43 showed the mineralized zone to contain intervals less than the cut-off of 0.05% U3O8 over widths greater than the maximum internal dilution of 2.0 metres. The downhole probe results for HK16-47, provided in the Purepoint press release dated March 16th, 2016, estimated the mineralized intercept as 0.82% e U3O8 over 19.6 metres that is comparable to the assay results of 0.88% U3O8 over 20.1 metres. Probe results for HK16-52 provided an estimate of 18.5 metres at 0.68% e U3O8 while the assay results returned 18.1 metres of 0.74% U3O8.