Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Prime Intercepts 10.7 Metres of 2.42 gpt Au and 24.5 gpt Ag and 26 Metres of 1.07 gpt Au and 20.3 gpt Ag in Zapote North

In This Article:

Prime Mining Corp.
Prime Mining Corp.

VANCOUVER, British Columbia, May 02, 2022 (GLOBE NEWSWIRE) -- Prime Mining Corp. (“Prime” or the “Company”) (TSX-V: PRYM, OTCQB: PRMNF, Frankfurt: 04V3) announces new drill results that continue to expand Zapote North, one of eight known mineralized deposits, at its wholly-owned Los Reyes gold-silver project (“Los Reyes”) in Sinaloa State, Mexico.

Results reported today are from 17 new drill holes from exploration targeting the northern extension of the Zapote-Tahonitas structure (“Z-T Structure”). Two of the 17 holes are the final Phase 2 results for Mariposa and the other 15 new drill holes are from Zapote North (see Figures 1 and 2). This drilling is targeting the expansion of the Zapote North deposit northwards along the structure and confirming the continuity of mineralization of Mariposa to the south. These holes confirm that gold-silver mineralization extends from Zapote North to Mariposa.

Highlight Step Out Drill Intercepts

Zapote North Deposit

  1. 4.81 grams per tonne (“gpt”) gold (“Au”) and 17.2 gpt silver (“Ag”) over 2.4 m (1.7 m estimated true width (“etw”)) (22ZAP-56);

  2. 2.42 gpt Au and 24.5 gpt Ag over 10.7 m (9.7 m etw) (22ZAP-66R);

  3. 3.83 gpt Au and 13.9 gpt Ag over 1.5 m (1.4 m etw) (22ZAP-67R);

  4. 1.40 gpt Au and 13.8 gpt Ag over 8.7 m (8.2 m etw) (22ZAP-59);

  5. 1.07 gpt Au and 20.3 gpt Ag over 25.9 m (19.9 m etw), plus 10.7 m (8.2 m etw) at 0.77 gpt Au and 26.5 gpt Ag (22ZAP-52R);

  6. 1.73 gpt Au and 17.7 gpt Ag over 9.2 m (7.9 m etw) plus 10.7 m (8.2 m etw) at 0.68 gpt Au and 13.2 gpt Ag (22ZAP-68R); and,

  7. 1.42 gpt Au and 28.3 gpt Ag over 6.1m (5.0 m etw) (22ZAP-69R).

    Mariposa

  8. 1.10 gpt Au and 11.0 gpt Ag over 11.8 m (8.3 m etw) plus 7.1 m (5.4 m etw) at 0.99 gpt Au and 9.2 gpt Ag (22MA-08); and,

  9. 1.51 gpt Au and 14.7 gpt Ag over 4.5 m (2.9 m etw) (22MA-09).

Daniel Kunz, Prime’s Chief Executive Officer, commented: “Connecting open pit mineralization from Zapote North to Mariposa is an important development for the evolving Z-T Structure. This drilling has identified higher grade ore shoots of potentially open-pit mineable material with a focus on exploring the down dip extensions within known boiling zone elevations. The Zapote North deposit has expansion potential directly east and may be connected to the San Miguel West deposit. The Zapote North deposit also remains open southeast along strike toward Zapote South.”

To date for Phase 1 and 2 combined, Prime has drilled 255 holes totalling 64,070 metres (122 in Phase 1 for 25,650 m and 133 holes so far in Phase 2 for 38,420 m). There are currently 3 drill rigs working on the west side of the property (1 at Tahonitas, 1 between Zapote North and San Miguel West and 1 at San Miguel East.) and 5-rigs working on the east side of the property at Guadalupe. Another core rig is drilling at Fresnillo, between Z-T and Central Structures, as part of our area-wide exploration. The assay turnaround time is now 6-8 weeks, including the completion of QA/QC procedures.