Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Premium Resources Files NI 43-101 Technical Report: Initial Mineral Resource Estimate of 44.2 MT for the Selkirk Mine in Botswana

In This Article:

Toronto, Ontario--(Newsfile Corp. - January 10, 2025) - Premium Resources Ltd. (TSXV: PREM) (OTC Pink: PRMLF) ("PREM" or the "Company") is pleased to announce that the Company has filed an initial Mineral Resource Estimate ("MRE") titled "NI 43-101 Technical Report Selkirk Nickel Project, North East District, Republic of Botswana" (the "Technical Report") and dated January 8, 2025 (with an effective date of November 1, 2024) on its past-producing Nickel-Copper-Platinum Group Elements sulphide ("Ni-Cu-PGE") Selkirk deposit in Botswana (the "Selkirk Mine").

There are no material differences between the Technical Report and the information presented in this news release, and the results disclosed in the Company's news release dated November 27, 2024 titled "Premium Resources Announces Initial Mineral Resource Estimate of 44.2 MT for the Selkirk Mine in Botswana".

The Technical Report has been prepared by SLR Consulting (Canada) Ltd. in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and is available electronically on the Company's website at (www.premiumresources.com) and on SEDAR+ (www.sedarplus.ca) under PREM's issuer profile.

Qualified Persons

The initial MRE described in this news release was reviewed and approved by Valerie Wilson, M.Sc., P.Geo. (Ontario) SLR Consulting Ltd. Principal Resource Geologist, who is independent of PREM and a "qualified person" for purposes of NI 43-101.

Verification included a site visit to inspect historical mineralized core, explore the gossanous outcrop at surface, observe existing infrastructure, including the Selkirk underground ramp, and inspect several surface drillhole collar locations. In addition, all of the samples collected by PREM have been verified against independently accessed assay certificates and a random selection of historical database results have been compared against digital records.

The scientific and technical content of this news release has been reviewed and approved by Sharon Taylor, Vice President Exploration of the Company, who is a "qualified person" for the purposes of NI 43-101.

Technical Report

The MRE on the Selkirk Mine is supported by the Technical Report. Reference should be made to the full text of the Technical Report for the assumptions, qualifications and limitations set forth therein, a copy of which is available on SEDAR+ (www.sedarplus.ca) under PREM's issuer profile.