Unlock stock picks and a broker-level newsfeed that powers Wall Street.

OROCO PRIVATE PLACEMENT OVERSUBSCRIBED

In This Article:

Oroco Resource Corp.
Oroco Resource Corp.

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

VANCOUVER, Canada, Feb. 12, 2025 (GLOBE NEWSWIRE) -- Oroco Resource Corp. (TSX-V: OCO, OTC: ORRCF) (“Oroco” or the “Company”) is pleased to announce that the non-brokered private placement financing (the “Offering”) announced by the Company on February 5, 2025, is now oversubscribed due to strong investor demand.  As a result, the Company is no longer accepting new subscriptions and now intends to close the Offering, subject to the receipt of all necessary regulatory approvals, including the approval of the TSX Venture Exchange.

ABOUT OROCO

The Company holds a net 85.5% interest in those central concessions that comprise 1,173 hectares “the Core Concessions” of The Santo Tomas Project, located in northwestern Mexico. The Company also holds an 80% interest in an additional 7,861 hectares of mineral concessions surrounding and adjacent to the Core Concessions (for a total Project area of 9,034 hectares, or 22,324 acres). The Project is situated within the Santo Tomas District, which extends up to the Jinchuan Group’s Bahuerachi Project, approximately 14 km to the northeast. The Project hosts significant copper porphyry mineralization initially defined by prior exploration spanning the period from 1968 to 1994. During that time, the Project area was tested by over 100 diamond and reverse circulation drill holes, totalling approximately 30,000 meters. Commencing in 2021, Oroco conducted a drill program (Phase 1) at Santo Tomas, with a resulting total of 48,481 meters drilled in 76 diamond drill holes.

The drilling and subsequent resource estimates and engineering studies led to a revised MRE and an updated PEA being published and filed in August of 2024, which studies are available at the Company’s website www.orocoresourcecorp.com and by reviewing the Company profile on SEDAR at www.sedarplus.ca..

The Santo Tomas Project is located within 170 km of the Pacific deep-water port at Topolobampo and is serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and natural gas) through the city of Los Mochis to the northern city of Choix. The property is reached, in part, by a 32 km access road originally built to service Goldcorp’s El Sauzal Mine in Chihuahua State.

Additional information about Oroco can be found on its website and by reviewing its profile on SEDAR at www.sedarplus.ca.

For more information, please contact:

Craig Dalziel, Chairman
Oroco Resource Corp. 
Tel: 604-688-6200 
Email: info@orocoresourcecorp.com 
www.orocoresourcecorp.com