Orezone Intercepts High-Grade Mineralization Below North Zone Life of Mine Pits Including 2.55 G/T Gold Over 23.00m and 1.14 G/T Gold Over 29.50m

In This Article:

Orezone Gold Corporation
Orezone Gold Corporation

VANCOUVER, British Columbia, Jan. 26, 2025 (GLOBE NEWSWIRE) -- Orezone Gold Corporation (TSX: ORE, OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to provide additional drill results from its recently announced multi-year exploration campaign at its flagship Bomboré Gold Mine. The new results are centered on the North Zone, with high grades intercepted below both the North Zone Footwall and North Zone Hill resource and reserve pits.

Selected Drill Highlights:

  • 2.55 g/t Au over 23.00m, including 5.54 g/t Au over 5.00m (BBD1324)

  • 1.14 g/t Au over 29.50m, including 2.30 g/t Au over 4.50m (BBD1320)

  • 1.20 g/t Au over 23.80m (BBD1323)

  • 1.01 g/t Au over 18.70m (BBD1319)

  • 1.80 g/t Au over 15.00m (BBD1318)

  • 1.59 g/t Au over 9.80m (BBD1318)

  • 1.69 g/t Au over 6.85m (BBD1322)

  • 24.74 g/t Au over 2.00m (BBD1323)

Patrick Downey, President and CEO stated, “These latest drill results further underscore the significant exploration upside at Bomboré, and the potential to materially expand the resource base from the current global 5.1 million gold ounces, to a targeted 7 to 10 million gold ounces longer term. Given Bomboré’s 14km long reserve defined strike length at an average reserve pit depth of less than 40m, we have been aggressive in our pursuit of illustrating this potential. Towards this goal, we are accelerating the Phase I exploration campaign and planning a comprehensive 30,000m drill program through 2025. Recent drilling from only 12 wide spaced drill holes in the North Zone Footwall has successfully extended mineralization 100m to 250m below the reserve pit bottoms along a strike length of over 800m. This has clear implications in terms of extending current life of mine pits to depth and increasing the future production profile at Bomboré.

The discovery potential of the orogenic gold setting at Bomboré is also highlighted by the multiple higher-grade sub-zones, which we believe may host the potential to transition into an underground mining scenario beneath the existing life of mine open pits. This prospect continues to be an area of focus at North Zone Hill, as well as at P16 and P17 where drilling has recently commenced.

Together with our ongoing production expansion, which is currently ahead of schedule, this renewed focus on exploration at Bomboré, and testing the overall size and scale of the broader system, represent a truly exciting time for Orezone on multiple fronts.”

North Zone Footwall – Extending Mineral System to Depth

Initial drilling last year, targeting the North Zone Footwall at depth, was successful in extending high-grade mineralization 240m below the current reserve pit, with intercepts of 1.02g/t Au over 57.00m (BBD1313) and 1.64g/t Au over 46.00m (BBD1314). Wide spaced follow-up drilling was successful in extending mineralization 100m to 250m below the reserve pits along a strike length of over 800m (Figure 2). This was marked by several broad high-grade intercepts including 1.17g/t Au over 29.50m (BBD1320), 1.20g/t Au over 23.80m (BBD1323), 1.01g/t Au over 18.70m (BBD1319) and 1.80g/t Au over 15.00m (BBD1318).