Noram Receives Results for CVZ-77 & 78: High-Grade Intercepts of 240 Ft (73.2 m) Averaging 1212 PPM, & 231.3 Ft (70.5 m) Averaging 1157 PPM Respectively

In This Article:

VANCOUVER, BC / ACCESSWIRE / June 9, 2022 / Sandy MacDougall, CEO of Noram Lithium Corp. ("Noram" or the "Company") (TSXV:NRM | OTCQB:NRVTF | Frankfurt:N7R) is pleased to announce the successful completion of CVZ-77 (PH-04) and CVZ-78 (PH-11) and release of the final assay results. The Company completed core hole CVZ-77 at a depth of 458 feet (139.6 m). Sampling for assays began at 20 ft (6.1 m) and continued to the bottom of the hole, an interval thickness of 240 ft (73.2 m) was intersected from 48 ft (14.6 m) to 288 ft (87.8 m). The weighted average lithium values present are summarized below with a high of 2140 ppm. The Company completed core hole CVZ-78 at a depth of 451.5 feet (137.6 m). Sampling for assays began at 26.8 ft (8.2 m) and continued to the bottom of the hole, an interval thickness of 231.3 ft (70.5 m) was intersected from 26.8 ft (8.2 m) to 258 ft (78.6 m). The weighted average lithium values present are summarized below with a high of 2100 ppm present.

Noram Lithium Corp., Thursday, June 9, 2022, Press release picture
Noram Lithium Corp., Thursday, June 9, 2022, Press release picture
Noram Lithium Corp., Thursday, June 9, 2022, Press release picture
Noram Lithium Corp., Thursday, June 9, 2022, Press release picture

Figure 1 - Location of all past drill holes (Phase I to Phase V) previously completed in addition to the 12 proposed holes for Phase V1. Phase VI holes are indicated in purple.

Noram Lithium Corp., Thursday, June 9, 2022, Press release picture
Noram Lithium Corp., Thursday, June 9, 2022, Press release picture

Figure 2. Comparative stratigraphy and assay results for drill holes CVZ-77 and CVZ-78 as compared to CVZ-65 which was drilled as part of a prior program. The histogram on the sides of the holes are the composited lithium grades in ppm Li. The cross section has a 4X vertical exaggeration.

"As we continue to receive results that meet and/or surpass our expectations, our level of confidence in the resource model continues to increase. This program is providing us with vital information that will allow us to upgrade a significant portion of the resource from the Inferred Category to the Indicated Category. We could not be more proud of the team we have diligently advancing the Project. Noram management is focused on enhancing shareholder value as we continue to develop the resource" comments Brad Peek, VP of Exploration and geologist on all six phases of Noram's Clayton Valley exploration drilling.

Hole ID

Sample No.

From (ft)

To (ft)

From (m)

To (m)

Li (ppm)

CVZ-77

1748459

20

28

6.1

8.5

610

CVZ-77

1748460

28

38

8.5

11.6

850

CVZ-77

1748461

38

48

11.6

14.6

870

CVZ-77

1748462

48

58

14.6

17.7

1010

CVZ-77

1748463

58

68

17.7

20.7

840

CVZ-77

1748464

68

78

20.7

23.8

910

CVZ-77

1748465

78

88

23.8

26.8

840

CVZ-77

1748466

88

98

26.8

29.9

940

CVZ-77

1748467

98

108

29.9

32.9

600

CVZ-77

1748468

108

118

32.9

36.0

1160

CVZ-77

1748469

118

128

36.0

39.0

980

CVZ-77

1748471

128

138

39.0

42.1

1540

CVZ-77

1748472

138

148

42.1

45.1

1340

CVZ-77

1748473

148

158

45.1

48.2

1400

CVZ-77

1748474

158

168

48.2

51.2

1510

CVZ-77

1748475

168

178

51.2

54.3

1860

CVZ-77

1748476

178

188

54.3

57.3

2140

CVZ-77

1748477

188

198

57.3

60.4

1300

CVZ-77

1748478

198

208

60.4

63.4

1290

CVZ-77

1748479

208

218

63.4

66.4

1450

CVZ-77

1748480

218

228

66.4

69.5

1630

CVZ-77

1748481

228

238

69.5

72.5

1250

CVZ-77

1748482

238

248

72.5

75.6

1060

CVZ-77

1748483

248

258

75.6

78.6

1080

CVZ-77

1748484

258

268

78.6

81.7

950

CVZ-77

1748485

268

278

81.7

84.7

1020

CVZ-77

1748486

278

288

84.7

87.8

990

CVZ-77

1748487

288

298

87.8

90.8

790

CVZ-77

1748488

298

308

90.8

93.9

620

CVZ-77

1748489

308

318

93.9

96.9

870

CVZ-77

1748490

318

328

96.9

100.0

760

CVZ-77

1748491

328

338

100.0

103.0

430

CVZ-77

1748492

338

348

103.0

106.1

610

CVZ-77

1748493

348

358

106.1

109.1

550

CVZ-77

1748494

358

368

109.1

112.2

550

CVZ-77

1748495

368

378

112.2

115.2

720

CVZ-77

1748496

378

388

115.2

118.3

540

CVZ-77

1748497

388

398

118.3

121.3

790

CVZ-77

1748498

398

408

121.3

124.4

780

CVZ-77

1748499

408

418

124.4

127.4

600

CVZ-77

1748500

418

428

127.4

130.5

550

CVZ-77

1748501

428

438

130.5

133.5

500

CVZ-77

1748502

438

448

133.5

136.6

379

Table 1 - Sample results from CVZ-77 from 20 ft (6.1 m) to depth of 448 ft (136.6 m).