Unlock stock picks and a broker-level newsfeed that powers Wall Street. Upgrade Now
Nicola Mining Drills 53.0 Metres of over 1.0% Copper and Confirms near Surface Copper in MARB / CAS Zones

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - February 20, 2025) - Nicola Mining Inc. (TSX: NIM) (OTCQB: HUSIF) (FSE: HLIA) (the "Company" or "Nicola")  has completed drilling (totaling 4874m and 14 holes; Table 1) and is pleased to provide updates on its highly successful 2024 Drilling Exploration Program (the "2024 Program")1 at its New Craigmont Copper Project, near Merritt, BC. Intervals of significant copper mineralization are presented in Table 2.

Table 1. 2024 Drill Holes*

Hole ID

Easting

Northing

Elevation (m)

Azimuth (°)

Dip (°)

End of Hole (m)

WP-24-001

642289

5565271

1362

0

-75

377.93

WP-24-002

642289

5565271

1362

270

-45

207.25

WP-24-003

642256

5564903

1377

355

-45

658.00

WP-24-004

642268

5564904

1378

110

-45

211.22

WP-24-004A

642268

5564904

1378

110

-45

374.89

MB-24-001

644977

5565105

1437

35

-55

402.43

MB-24-002

644977

5565105

1437

325

-55

252.98

MB-24-003

645113

5565129

1460

210

-60

323.07

MB-24-004

645113

5565129

1460

35

-60

276.76

MB-24-005

645848

5564858

1529

180

-60

399.29

MB-24-006

645113

5565129

1460

265

-67

119.01

MB-24-006A

645113

5565129

1460

265

-67

121.92

NC-24-001

646680

5564179

934

205

-60

594.36

NC-24-002

646680

5564179

934

185

-58

554.71

 

*Collar coordinates approximate based on handheld GPS (NAD83, Zone 10), and will be professionally surveyed in 2025 when the snow melts.

Table 2. Significant Drill Hole Intervals

Hole ID

Interval (m)

Grade

From (m)

To (m)

MB-24-001

40.5

0.10% Cu

52.5m

93.0m

Includes: 9.48m @ 0.34% Cu

MB-24-004

28.3

0.11% Cu

18.3m

46.7m

Includes: 10.86m @ 0.23% Cu

NC-24-001

56.6

0.17% Cu

313.7m

370.3m

Includes: 33.8m @ 0.23% Cu


75.0

0.36% Cu

404.0m

479.0m

Includes: 10m @ 0.97% Cu and
Includes: 12m @ 0.85% Cu and

NC-24-002

52.9m

1.03%

344.1m

397.0m

Includes: 13.0m @ 3.46% Cu

 

Note: Detailed results on Company website.

New Craigmont Copper Project 2024 Exploration
The first phase of the 2024 Program at the never-before-drilled West Craigmont-WP target totaled ~1829.70m (5 holes, 1 of which was a twin/redrill, Fig. 1) with initial findings reported in the August 30, 2024 Operations and Exploration Update. Observations suggest a porphyry system; however, additional geological analysis and drilling will be required to establish potential in the area.

Figure 1. Collar locations of 2024 drilling Program at the New Craigmont Project.

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/4873/241567_0e769922d46fe850_001full.jpg

Upon completion of the first phase, drilling commenced at the unexplored MARB-CAS Zones. Drilling is aimed to understand geology and assess mineralization potential beneath two mineralized outcrops, one at the MARB Zone and another at the CAS Zone.