Newcore Gold Drilling Intersects 1.96 g/t Gold over 62.0 Metres, Including 2.23 g/t Gold over 28.0 Metres at the Enchi Gold Project, Ghana

In This Article:

Newcore Gold Ltd.
Newcore Gold Ltd.

First Drill Results from the 10,000-metre RC Drill Program Underway at Enchi

VANCOUVER, British Columbia, Oct. 08, 2024 (GLOBE NEWSWIRE) -- Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU, OTCQX: NCAUF) is pleased to announce drill results from the 10,000-metre drill program underway at the Company’s 100% owned Enchi Gold Project ("Enchi" or the "Project") in Ghana. Reverse Circulation ("RC") drilling at the Boin Gold Deposit ("Boin") completed as part of the resource growth and infill program designed to convert Inferred Resources to Indicated intersected 1.96 grams per tonne gold ("g/t Au") over 62.0 metres ("m") from 139 m in hole KBRC288, including 2.31 g/t Au over 25.0 m from 139 m. This hole ended in mineralization with an interval of 2.23 g/t Au over 28.0 m from 171 m, intersected outside the current limits of the pit constrained Mineral Resource Estimate. All drill holes intersected gold mineralization, successfully proving the continuity of gold mineralization and potential for future resource growth at Boin.

Highlights from Drilling at the Boin Gold Deposit at Enchi

  • Drilling intersected multiple structures and successfully proved the continuity of higher-grade mineralization at Boin.

    • Drilling encountered mineralization in both the near surface oxides and upper portions of the sulphides.

    • Hole KBRC288 intersected 1.96 g/t Au over 62.0 m from 139 m, including 2.31 g/t Au over 25.0 m from 139 m, and 2.23 g/t Au over 28.0 m from 171 m which was intersected outside the limits of the pit that constrains the current Mineral Resource Estimate. Hole KBRC288 ended in mineralization.

  • All drill holes intersected gold mineralization, confirming continuity along strike and down dip for the two principal structures which comprise the Boin Gold Deposit.

    • Hole KBRC289 intersected 1.46 g/t Au over 10.0 m from 97 m, with a second zone of 0.65 g/t Au over 11.0 m from 66 m.

    • Hole KBRC291 intersected multiple mineralized zones including 1.16 g/t Au over 6.0 m from 11 m, 0.77 g/t Au over 7.0 m from 56 m, and 0.56 g/t Au over 17.0 m from 122 m.

In addition to the 10,000-metre RC drill program that is underway, further exploration and development work is on-going at Enchi to continue to de-risk the development of the Project and prove-out the district scale exploration potential. This work includes additional metallurgical testwork, drone surveys, an airborne magnetic survey, trenching and soil sampling.

Greg Smith, VP Exploration of Newcore stated, "This first set of drill results from the 2024 drill program has successfully confirmed the continuity of mineralization at the Boin Gold Deposit, within both the oxide horizon as well as the upper portions of the sulphide mineralization. This set of drilling focused on the central portion of the Boin deposit, consisting of 50-metre spaced sections with drill holes spaced every 25 metres along the sections to prove-up the continuity of gold mineralization. All drill holes successfully encountered mineralization with hole KBRC288 ending in mineralization that is outside the limits of the pit that currently constrains the resource at Boin, highlighting the opportunity for future resource growth at depth as well as along strike. This first phase of the drilling program is an important step in advancing the Project as we focus on proving up the confidence level of the existing resources at Enchi."