Newcore Gold Drilling Intersects 0.94 g/t Gold over 54.0 Metres, Including 2.08 g/t Gold over 11.0 Metres at the Enchi Gold Project, Ghana

In This Article:

Newcore Gold Ltd.
Newcore Gold Ltd.

10,000-metre RC Drill Program Underway at Enchi; Drilling Continues to Encounter Mineralization Outside the Limits of the Pit that Constrains the Mineral Resource Estimate

VANCOUVER, British Columbia, Oct. 30, 2024 (GLOBE NEWSWIRE) -- Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU, OTCQX: NCAUF) is pleased to announce additional drill results from the 10,000-metre drill program underway at the Company’s 100% owned Enchi Gold Project ("Enchi" or the "Project") in Ghana. Reverse Circulation ("RC") drilling at the Boin Gold Deposit ("Boin") completed as part of the resource growth and infill program designed to convert Inferred Resources to Indicated intersected 0.94 grams per tonne gold ("g/t Au") over 54.0 metres ("m") from 150 m in hole KBRC294, including 2.11 g/t Au over 7.0 m from 151 m and 2.08 g/t Au over 11 m from 170 m. Hole KBRC294 ended in mineralization outside the current limits of the pit constrained Mineral Resource Estimate. All drill holes intersected gold mineralization, continuing to prove out the continuity of gold mineralization and potential for future resource growth at Boin.

Highlights from Drilling at the Boin Gold Deposit at Enchi

  • All drill holes intersected gold mineralization, confirming continuity along strike and down dip for the two principal structures which comprise the Boin Gold Deposit.

    • Drilling encountered mineralization in both the near surface oxides as well as the upper portions of the sulphides.

    • Hole KBRC296 intersected 1.44 g/t Au over 25.0 m from 31 m in the oxides, with a second zone of 2.26 g/t Au over 7.0 m from 67 m in the transitional material.

    • Hole KBRC298 intersected 0.53 g/t Au over 61.0 m from 159 m, including 1.07 g/t Au over 12.0 m from 173 m.

    • Hole KBRC295 intersected 1.25 g/t Au over 24.0 m from 130 m.

  • Hole KBRC294 ended in mineralization which was intersected outside the limits of the pit that constrains the current Mineral Resource Estimate.

    • Multiple structures intersected, with drilling continuing to prove out the continuity of higher-grade mineralization at Boin.

    • Hole KBRC294 intersected 0.94 g/t Au over 54.0 m from 150 m, including 2.11 g/t Au over 7.0 m from 151 m, and 2.08 g/t Au over 11.0 m from 170 m, and a second interval of 3.24 g/t Au over 6.0 m from 107 m including 16.52 g/t Au over 1.0 m from 109 m.

In addition to the 10,000-metre RC drill program that is underway, further exploration and development work is on-going at Enchi to continue to de-risk the development of the Project and prove-out the district scale exploration potential. This work includes additional metallurgical testwork, drone surveys, hydrogeological testing, condemnation drilling, geotechnical work, environmental work, an airborne magnetic survey, trenching and soil sampling.