Nevada Sunrise Receives US$300,000 for the Sale of Non-Core Claims at the Gemini Lithium Project, Nevada

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - January 16, 2025) - Nevada Sunrise Metals Corporation (TSXV: NEV) (OTC Pink: NVSGF) ("Nevada Sunrise" or the "Company") is pleased to announce that the Company has completed a purchase and sale agreement (the "Transaction") with Dome Rock Resources, LLC ("Dome Rock"), a private South Dakota company, whereby Dome Rock has purchased fifty-seven (57) non-core claims (the "Claims") from the Company. The Claims are located along the eastern boundary of the Gemini Lithium Project ("Gemini", or the "Project") in the Lida Valley near the town of Gold Point in Esmeralda County, Nevada. Following the closing the Transaction, Nevada Sunrise staked an additional thirty-three (33) claims in the Lida Valley to the north of the Gemini claims.

The western boundary of the Claims sold in the Transaction is approximately 2 kilometres (1.33 miles) to the east of the Company's National Instrument 43-101-compliant lithium resource area calculated in 2024, representing approximately 20% of the total Project area (see Figure 1 below). The purchase price for the acquisition of the Claims by Dome Rock was US$300,000 in cash, which has been received in full by Nevada Sunrise.

Figure 1. Gemini Lithium Project Area Showing Dome Rock Claims Acquisition

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/2799/237370_nevadasunrise1.jpg

In late November 2024, Dome Rock paid a non-refundable cash deposit of US$25,000 and entered into a 30-day period in which it carried out customary due diligence for a transaction of this nature. Following completion of due diligence by Dome Rock, the Transaction closed in late December 2024. A finder's fee of 5.0% cash totaling US$15,000 was paid to an arm's-length party for making the introduction to Dome Rock that led to a successful closing of the Transaction.

About Gemini

Gemini consists of 291 unpatented mineral claims located in the western Lida Valley, Esmeralda County, approximately 6 miles (10 kilometres) east of the town of Lida, and 3 miles (4.5 kilometres) north of Gold Point, Nevada. The Lida Valley is a flat, arid basin with a similar geological setting to the better-known Clayton Valley basin where Albemarle Corporation operates the Silver Peak lithium brine mine, which has operated continuously since 1966.

Gemini is situated adjacent to the Gold Point Solar Energy Zone, a Bureau of Land Management land reserve set aside for solar and wind power generation projects until 2033. Exploration at Gemini is complemented by the Company's 80.09 acre/feet/year water right, a pre-requisite for the exploration and development of mineral projects in Nevada.