Unlock stock picks and a broker-level newsfeed that powers Wall Street. Upgrade Now
Mustang Energy Corp. Applies for Exploration Permits on Yellowstone and Dutton Projects

In This Article:

Mustang Energy Corp.
Mustang Energy Corp.

VANCOUVER, British Columbia, Nov. 06, 2024 (GLOBE NEWSWIRE) -- Mustang Energy Corp. (CSE: MEC, OTC: MECPF, FRA: 92T) (the “Company” or “Mustang”) is pleased to announce that it has applied for exploration permits on its Yellowstone and Dutton projects in northern Saskatchewan. The applications, recently submitted to the Saskatchewan Ministry, represent Mustang’s commitment to advancing these uranium projects located within the Athabasca Basin, Saskatchewan. With these permit applications, Mustang aims to initiate exploration activities aimed at further assessing the viability of the projects.

In addition to the Yellowstone and Dutton permit applications, Mustang is also expecting imminent exploration permits for its Cigar Lake East and Roughrider South projects located in the eastern Athabasca Basin region. Forthcoming permits for these two projects will enable Mustang to begin ground-based exploration activities. With the successful approval of exploration permits, Mustang looks forward to launching ground-based exploration activities in 2025.

“We are excited to take this significant step forward with the permit applications for our Yellowstone and Dutton projects in the Athabasca Basin. These projects, along with our Cigar Lake East and Roughrider South properties, are central to Mustang’s strategy of building a robust portfolio in one of the world’s premier uranium-producing regions. Pending permit approvals, we look forward to advancing exploration efforts across these sites to unlock their potential and move closer to becoming a leading explorer in the Canadian uranium sector.” — Lynde Guillaume, Technical Advisor, Mustang Energy Corp.

Mustang Energy Corp.'s Projects Map in the Athabasca Basin, Saskatchewan
Mustang Energy Corp.'s Projects Map in the Athabasca Basin, Saskatchewan


Figure 1: Mustang Energy Corp.'s Projects Map in the Athabasca Basin, Saskatchewan.


Preliminary Exploration Plan 2024-2025:

Phase 1 (fall 2024 – spring 2025) is expected to focus on geophysical surveys, refining targets using MobileMT/ ZTEM and VTEM/ TDEM with reinterpretations of historic geophysical surveys that covering portions of the projects. Infill MobileMT will be conducted over areas of the Yellowstone property not covered by previous surveys and a reinterpretation of historic geophysics grids. VTEM/TDEM is planned over portions of the Dutton and Spur Projects not covered by previous surveys which will be reevaluated. There will be a reinterpretation of VTEM surveys completed in 2023, including the newly acquired Brown project.

Phase 2 (spring – fall 2025) is expected to focus on ground geophysics and ground truthing targets which will be executed to define drill targets outlined by the aerial EM surveys in Phase 1. Ground truthing of targets through field work programs is anticipated be carried out on the projects located south of the Athabasca Basin. Ground geophysics is planned over Ford Lake with subsequent drilling of identified targets. Targets identification on other projects will follow with drill planning for a potential Phase 3 will based and contingent upon the results of phases 1 and 2.


Waiting for permission
Allow microphone access to enable voice search

Try again.