In This Article:
Geochemical and geophysical results confirm prospectivity for sediment-hosted copper potential at Rae Project
PERTH, Australia, Oct. 29, 2024 /PRNewswire/ -- White Cliff Minerals Limited ("the Company") is pleased to announce the initial results from the first project scale airborne geophysical survey at the Rae Copper Project ("Rae" or "the Project"), Nunavut, Canada. Results confirm prospectivity for district scale sediment-hosted copper potential.
-
With the Company's latest land acquisition, the Hulk exploration district has expanded to cover 152km2 within a larger, broader sub-basin that has interpreted dimensions that exceed 20km by 10km
-
The MobileMT airborne survey, conducted over 2,400 line-km at the Project, represents the latest innovation in airborne electromagnetic technology and the most advanced generation of airborne AFMAG technologies. It is the only system proven to deliver geoelectrical information from shallow to > 1km depth range with high spatial (lateral and in-depth) and resistivity resolution
-
The Hulk district represents 505 of the total 2,400 line-km flown as part of the aerial survey. The Company continues to review, interpret and analyse several additional anomalies within the greater Rae Project area that have shown elevated conductive signatures - these results will be confirmed prior to the end of the year
-
Final analysis and interpretation of the survey completed in conjunction with Expert Geophysics has identified three, distinct, conductive anomalies at the Hulk sedimentary target
-
These target areas are fault controlled, sub basins covering >20km of strike, with mineralization being targeted from surface to an estimated depth of ~300mtrs with up to 70mtr intersections within the Rae Group sedimentary structures.
-
East (Target A):
-
situated less than 2km west of the historic drill intercept of sediment hosted copper by Kaizen Discovery Corp, where results from that drill program demonstrated increasing copper grades as drill holes progressed westward towards the Company's licences and the Hulk target area
-
the area is bounded by 2 major N/S trending faults, including the regional Herb Dixon structure - a known conduit of hydrothermal copper fluids
-
spans more than 4.5km E/W, 8km N/S and - open to the north into the newly acquired expanded claim
-
-
Central (Target B):
-
a fault-controlled target, sitting on the eastern side of the Herb Dixon structure
-
sitting within a 3.5km E/W, 8km N/S conductive footprint, also open to the north
-
-
West (Target C):
-
sits within the bounds of two major NW/SE faults and contains intersecting NW/SE and N/S structures, providing a geological structural boundary around the sedimentary basin
-
covers an area 10km N/S x 4km E/W and includes the CALMAL showing
-
-
The Herb Dixon Structure is a major regional North/South fault that cuts through the Hulk District. This same structure can be directly traced to the Company's Vision project where rock chip assays included 64.02%, 62.02%, 55.01% and 50.48% Cu