Mirasol Initiates Drill Program at Flagship Sobek Copper Project in Vicuña District, Chile

In This Article:

Mirasol Resources Ltd
Mirasol Resources Ltd
  • Drilling is underway at the High-Priority Potro SE target located 3 km from NGEx’s Lunahuasi

  • Ground based electrical geophysics were recently completed to refine the geometry of the porphyry target

  • The Potro SE target was defined and supported by coincident geological, geophysical, geochemical and alteration attributes

  • At Sobek Central, road construction to reach the Sobek 46 South target is in progress to facilitate geochemical sampling, ground geophysics and drilling later this season

  • The Sobek 46 South target is the southern extent of a 3 km trend of porphyry targets beginning at the VN-Zone located 7 km directly west of Filo Mining’s Filo del Sol Project

VANCOUVER, British Columbia, Nov. 28, 2024 (GLOBE NEWSWIRE) -- Mirasol Resources Ltd. (TSX-V: MRZ) (OTC: MRZLF) (the “Company” or “Mirasol”) is pleased to report that drilling has started at the Potro SE target on the Company’s 100%-owned Sobek Copper-Gold Project (“Sobek” or “the Project”) in the Vicuña District of Chile. Located at the southern corner of the Sobek North property block the Potro SE target is strategically situated just 3 kilometers from NGEx’s Lunahuasi discovery and is the first of two high priority porphyry targets planned for drilling this season (news release dated May 13, 2024).

“We are excited to announce that drilling is well underway at Sobek North,” Mirasol’s President and CEO Tim Heenan stated. “The Potro SE target is characterized by a shallow cylindrical shaped magnetic high response with a coincident high IP chargeability located at the intersection of two productive faults reinforcing its potential as a concealed porphyry target.”

Figure 1: Vicuña District - Expanded Sobek Property including the Potro SE Target and Sobek 46 South Target

Drilling High-Priority Potro SE Target - Sobek North

A diamond drill is on site and drilling is in progress to test the Potro SE target. The first diamond drill hole is anticipated to reach the top of the target at a depth of 250-350 meters and continue to a total depth of 700-800 meters. It is expected to take 25-30 days to complete the planned drilling.

The Potro SE target is a cylindrically shaped magnetic high anomaly previously identified from an airborne-magnetics survey supported by coincident copper-moly geochemical anomalies sourced from both soil grid and rock chip sampling (news release dated May 13, 2024). An Induced Polarization (IP), Pole-Di-Pole (PDP) geophysical chargeability response is also spatially associated with the Potro SE cylindrical magnetic high target and located at the intersection of two productive faults the Maranceles Fault and the Ventana Fault (which continues 3 kilometers north-northeast to Lunahuasi). These concurrent geological, geophysical, geochemical and alteration attributes reinforce Potro SE’s potential as an attractive concealed porphyry system.