Mayfair Gold Updates Fenn-Gib Open-Pit Mineral Resource and Initiates an Expanded Metallurgical Test Program

In This Article:

VANCOUVER, BC, Sept. 10, 2024 /CNW/ - Mayfair Gold Corp. ("Mayfair", or the "Company") (TSXV: MFG) (OTCQB: MFGCF) is pleased to report an updated mineral resource estimate at the Company's 100% controlled Fenn-Gib Gold Project, located in the Timmins region of Northeast Ontario. The updated resource estimate incorporates 69 new drill holes for 46,955m of predominantly infill drilling, along with a new lithological model. This updated Mineral Resource will form the basis of the Company's Pre-Feasibility Study (PFS) which is currently underway. Additionally, the company is further pleased to announce that it is extending metallurgical test work for Fenn-Gib.

Highlights

  • Indicated Mineral Resource of 4.31Moz Au (0.3g/t Au cut-off grade)

  • Robust grade-tonnage curve demonstrates optionality to sequence for higher grades

  • Comprehensive metallurgical test program initiated with results expected in Q1 2025

Mayfair's Interim Chief Executive Officer Darren McLean commented,

"We are pleased to report an updated open-pit mineral resource for Fenn-Gib, highlighting the robustness of Fenn-Gib's grade-tonnage sensitivity (Table 1). This optionality, paired with our world-class infrastructure setting, affords Fenn-Gib a variety of development scenarios from small-scale opportunities targeting higher grades, to bulk options leveraging economies of scale. With the 2024 mineral resource refined and finalized, we look forward to accelerating the Pre-Feasibility Study towards completion. We have also initiated further metallurgical testing to enhance our understanding of the rougher flotation regrind option followed by a leach. Expanding on previous testing, we intend to refine our understanding of the optimal feed and grind sizes and to test these parameters across a representative range of lithologies, grades, and zones within the Fenn-Gib open pit."

Table 1. Fenn-Gib Open-Pit Mineral Resource Estimate


Cutoff (Au g/t)

Tonnes

Au (g/t)

Au (oz)

INDICATED

>0.7

64,563,000

1.26

2,615,000

>0.6

82,125,000

1.13

2,984,000

>0.5

105,644,000

1.00

3,397,000

>0.4

137,251,000

0.87

3,839,000

>0.3

181,302,000

0.74

4,313,000


Cutoff

Tonnes

Au (g/t)

Au (oz)

INFERRED

>0.7

1,140,000

0.96

35,000

>0.6

1,799,000

0.85

49,000

>0.5

2,710,000

0.75

65,000

>0.4

4,729,000

0.62

94,000

>0.3

8,921,000

0.49

141,000

Notes:

1. Effective date of this updated mineral resource estimate is September 3, 2024. The assay cut-off date for drill holes included in the mineral resource was April 30, 2024.

2. All mineral resources have been estimated in accordance with Canadian Institute of Mining and Metallurgy and Petroleum ("CIM") definitions, as required under National Instrument (NI) 43-101. Mineral Resource Statement prepared by Tim Maunula, P. Geo (T. Maunula & Associates Consulting Inc.) in accordance with NI 43-101.