Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Max Resource Announces Shareholder Approval of IPO Offering of Max Iron Brazil Ltd. for Admission to the Official List of the ASX

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - February 27, 2025) - MAX RESOURCE CORP. (TSXV: MAX) (OTC Pink: MXROF) (FSE: M1D2) ("Max" or the "Company") is pleased to announce that, further to its news releases on December 12, 2024, January 2, 2025, January 7, 2025, January 9, 2025, January 20, 2025 and January 31, 2025, at the special meeting held on February 26, 2025, shareholders of the Company approved an ordinary resolution approving the undertaking of an initial public offering by the Company's majority owned subsidiary, Max Iron Brazil Ltd. ("Max Brazil"). There was overwhelming support with 99.55% of shares voted at the meeting in favour of the resolution.

The Florália DSO Project is wholly owned by Max Brazil and is located 67 km east of Belo Horizonte, Minas Gerais, Brazil's largest iron ore and steel producing State. Max Brazil's 2024 exploration program has resulted in the technical team significantly increasing the Florália DSO geological target from 8-12mt at 58% Fe to 50-70mt at 55%-61% Fe.

Max cautions investors the potential quantity and grade of the iron ore is conceptual in nature, and further cautions there has been insufficient exploration to define a mineral resource and Max is uncertain if further exploration will result in the target being delineated as a mineral resource. Hematite mineralization tonnage potential estimation is based on in situ high-grade outcrops and interpreted and modelled magnetic anomalies. Density value used for the estimate is 2.8t/m³. Hematite sample grades range between 55-61%Fe. The 58 channel samples were collected for chemical analysis from in situ outcrops in previously mined slopes of industrial materials. Channel samples weighed in average 14 kg. Chemical analysis was performed at ALS Laboratories. Metal Oxides are determined using XRF analysis. Fusion disks are made with pulped samples and the addition of a borate-based flux. Max did not insert standards or blanks in the assay stream and is relying on ALS's lab QA/QC. DSO and Iron Ore are widely recognized industry terms, however they are not meant to imply Florália hosts mineral reserves or resources as defined in National Instrument 43-101.

The 2025 exploration campaign is well underway consisting of channel sampling, diamond and mobile auger power drilling. In addition, Max Brazil has commenced an environmental survey, a requirement for approval of mining titles (refer to Figures 1 and 2).

Figure 1: Florália DSO location map.

Two railway terminals and five iron ore operations located within 20 km