Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Mawson Finland Limited Reports First Results for 2025 Winter Drilling Program Significant Step-out Extensions in Rajapalot and New Downhole-EM Survey Results

In This Article:

Mawson Finland Limited ("Mawson" or the "Company") (TSXV:MFL) is pleased to announce drilling results from the first 6 drillholes from the 2025 drilling season at the Company's wholly-owned Rajapalot gold-cobalt project in Finland (see Table 1, Table 2, Table 3, and Figure 1 in Schedule "A" hereto).

Highlights:

  • 120 metre step-out discovery from Drillhole PAL0373 in South Palokas confirms the effectiveness of the project EM survey

  • Further significant gold-bearing intercepts drilled in down-dip extensions at Palokas zone in PAL0380

  • Confirmation of mineralised ‘Raja-footwall' EM conductor in drillhole PAL0378

  • Additional downhole EM (DHEM) surveys confirm the presence of significant conductors at depth in potential ‘down-dip' Raja position

Ms. Noora Ahola, Mawson Finland CEO, states:"We are very pleased to present the first of our results from the 2025 drilling season at Rajapalot. Most significantly, we have demonstrated the larger potential of both the South Palokas and Palokas mineralised zones, intercepting gold-bearing mineralisation in a large 120 metre step-out down-dip of our deepest intercept at South Palokas which targeted a deep downhole-EM conductor discovered in our recent 2024 geophysics program. Significant intercepts have also been drilled in the deeper portions of the Palokas zone, while additional mineralisation is also confirmed from Raja resource extension drillholes. Additional downhole-EM geophysical surveys conducted in January 2025 have also indicated the potential of further mineralization of the projected down-dip extension of the Raja zone in which target-test drilling will be immediately undertaken. These initial successes from our 2025 drilling season demonstrate open mineralisation to depth in several of our important mineralised zones, and bodes well for our ongoing resource expansion objectives. We look forward to bringing further drilling results in the very near future."

Detailed Results

Winter Drilling

Four diamond drilling rigs are actively drilling at the Rajapalot project. Ten diamond drillholes have been completed to date, for a total of 4,424 metres at time of writing. Primary aims for this season's drilling program are to extend the limits of the currently defined envelope of the Rajapalot inferred mineral resource, while secondary aims focus on target-test drilling of geochemical and geophysical targets developed during the summer and autumn field exploration season in order to advance the ‘exploration pipeline' and define new zones of gold-cobalt mineralization. To date, gold-assay results (cobalt values to be announced) have been received for the first 6 of the 10 completed holes and presented in Table 1, 2 and 3, and Figure 1.