Luna Gold Provides Corporate Update

VANCOUVER, BC--(Marketwired - March 03, 2016) - Luna Gold Corp. (LGC.TO),"Luna" or the "Company") is pleased to release initial results from its 2015 drilling program at the Aurizona Gold Project in Brazil.

2015 Drilling Program

The Company completed a drilling program in December 2015 consisting of 15,142 metres of oriented core drilling and 3,264 metres of reverse circulation drilling. The primary goal of the program was to infill drill the Piaba mineral resource with approximately 50-metre drill hole spacing versus the previous 100-metre spacing. Although the company has not yet received all of the assay results from the drilling program, the results support Luna's geological understanding and will give us greater certainty as we develop an updated resource model. Highlight intercepts from the drilling program are included in the table below. All drill results received to date, which represent 93% of the drilling, can be found on the Company's website at www.lunagold.com.

Hole Number

From

To

Total Length (m)

True Width (m)

Gold Grade (g/t)

BRAZD465

81.7

113.0

31.3

26.3

3.46

BRAZD467A

167.8

192.0

24.2

20.5

3.83

BRAZD469

207.8

353.5

145.7

112.3

1.18

BRAZD474

34.0

72.4

38.4

27.2

2.91

BRAZD481

112.5

136.5

24.0

18.2

4.68

BRAZD483

174.0

262.4

88.4

61.0

2.92

BRAZD487

217.3

289.1

71.8

55.4

4.25

BRAZD492

106.0

215.0

109.0

70.1

1.08

BRAZD500

99.0

130.2

31.2

24.6

4.10

Marc Leduc, President and CEO, stated, "We are pleased with the initial results from the 2015 exploration program. The results from the drilling campaign support our previous interpretations of the resource estimate and the more detailed structural knowledge and the greater drill density from the infill program will allow us to maintain much better control on our geological model. This will be an important planning tool for the preparation of our pre-feasibility study."

The 2015 drilling program also included an oriented core structural geological analysis of the Piaba mineral resource to allow Luna to better understand the structural controls and distribution of gold within the mineral resource. The drilling results and structural interpretation from the 2015 drilling program, along with results of previous years' drilling, will be used to create an updated block model, and mineral resource and reserve estimate that will be incorporated into a pre-feasibility study for the Aurizona Gold Project that is scheduled for completion during the second quarter of 2016.