Unlock stock picks and a broker-level newsfeed that powers Wall Street.

LithiumBank Confirms up to 95% Lithium Recovery and over 99% Impurity Rejection from DLE Pilot Testing Using SLB's Integrated Lithium Production Solution Technology on Boardwalk and Park Place Brines

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - April 14, 2025) - LithiumBank Resources Corp. (TSXV: LBNK) (OTCQX: LBNKF) ("LithiumBank'' or the "Company") is pleased to announce results from the Direct Lithium Extraction ("DLE") pilot campaign using SLB's integrated lithium production solution on bulk brine samples collected from the Boardwalk and Park Place lithium brine projects ("Boardwalk"), ("Park Place") located in west-central Alberta. The DLE tests based on ILiAD technology as part of the SLB's well-to-product integrated lithium production solution successfully recovered up to 95% of lithium from both Park Place and Boardwalk along with exceptional impurity removal of >99% for both brines (Table 1). Boardwalk and Park Place (Figure 1) combined host a total of 5,195,000 tonnes LCE measured and indicated at a grade of 81.6 mg/L lithium (Boardwalk only) and 24,474,000 tonnes LCE inferred at a grade of 80.1 mg/L lithium (Table 3) as recently announced on Feb. 20, 2025.

Highlights:

  • Up to 95% lithium recovery from pilot testing of Boardwalk and Park Place brines.

  • Greater than 99% overall combined impurity rejection, rejecting 98.80% of boron, 99.97% of calcium, 99.96% of magnesium, 99.98% of potassium, 99.98% of sodium, and 99.97% of strontium (Table 2).

  • Boardwalk and Park Place piloting campaigns combined processed approximately 70,000 litres of brine

  • Piloting results can be used to determine operating parameters for a ~25,000 cubic metres (m3) per day commercial scale DLE unit

  • The DLE technology absorbent in other piloting, processing alternate brines, has been shown to last 1000s of cycles over 6 years, has been shown to be able to be reconditioned and may have a service life of over 10 years

  • ILiAD adsorbent materials are sourced and manufactured in North America

"We are very pleased with the results from the Boardwalk and Park Place DLE piloting campaigns that produced an exceptionally pure lithium chloride ("LiCl") product with up to 95% lithium recovery. The results demonstrate both projects are highly compatible with the SLB integrated solution," commented Kevin Piepgrass, COO of LithiumBank. "After visiting the SLB lithium production demonstration plant in Clayton Valley, Nevada this past year, it is clear SLB can scale-up and optimize the DLE process within the entire end-to-end flowsheet that produces a battery grade lithium carbonate. We look forward to continuing our collaboration with the ILiAD/SLB team as LithiumBank assesses the best method of extracting lithium from brine at Boardwalk and Park Place. We will continue advanced DLE, and post-DLE test work with additional strategic groups."