Lithium South Development Announces Completion of Phase I Environmental Baseline Study and Progress on Phases II and III

In This Article:

VANCOUVER, BC, Sept. 12, 2024 /CNW/ -- Lithium South Development Corporation (the "Company" or "Lithium South") (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce the successful completion of Phase I of the Environmental Baseline Study for the Hombre Muerto North Lithium Project (HMN Li Project), located in Salta Province, Argentina. The report was completed by Knight Piesold Consulting (Argentina), a global engineering firm. The evaluation has taken 18 months and represents an important step for moving the project towards development.

(PRNewsfoto/Lithium South Development Corporation)
(PRNewsfoto/Lithium South Development Corporation)

The report presents comprehensive data pertaining to hydrology, hydrogeology, soil quality, flora and fauna, landscape and socio-cultural impact. The report establishes an environmental baseline from which the Company can further develop the project to an anticipated production rate of 15,600 tonnes per year of lithium carbonate using industry standard evaporation. This report will be key to the completion of an Environmental Impact Report seeking permissions to construct the mine.

The Company is now advancing with Phases II and III of the Environmental Impact Assessment, which will focus on:

  • Basic Engineering: The basic construction and waste engineering, for the preparation of the environmental impact assessment

  • Detailed Environmental Impact Assessments: In-depth analysis of potential environmental impacts due to the construction and operation of the production facility, particularly focusing on the construction of evaporation ponds.

  • Mitigation Strategies: Development of comprehensive plans to mitigate any identified environmental and social impacts, including water management plans and habitat restoration initiatives.

  • Stakeholder Engagement: Continued engagement with local communities and stakeholders to ensure transparency and address any concerns

Company Founder, President, and Chief Executive Officer, Adrian F. C. Hobkirk comments, "We are now arriving at an important milestone for the HMN Li Project, the filing for construction permissions. The Company is moving this process ahead in conjunction with completing a Definitive Economic Assessment. During this process, the project may be further enhanced in throughput size, exceeding the 15,600 tonnes per year recently published in our Preliminary Economic Assessment.  We look forward to completing the required engineering and well drilling on a fast -track basis."

Social Responsibility

The company as part of his social responsibility program is donating 5 Tn of NaCl (salt) to the community of Pastos Grandes. The NaCl was sourced from HMN Li Project evaporation ponds currently in operation.