LIFT intersects 22 m at 1.05% Li2O at its Fi Southwest pegmatite, Yellowknife Lithium Project, NWT

In This Article:

Li-FT Power Ltd.
Li-FT Power Ltd.

Figure 1

Location of LIFT’s Yellowknife Lithium Project. Drilling has been thus far focused on the Near Field Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group.
Location of LIFT’s Yellowknife Lithium Project. Drilling has been thus far focused on the Near Field Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group.

Figure 2

Plan view showing the surface expression of the Fi Southwest pegmatite with diamond drill holes reported in this press release.
Plan view showing the surface expression of the Fi Southwest pegmatite with diamond drill holes reported in this press release.

Figure 3

Cross-section illustrating YLP-0199 with results as shown in the Fi Southwest pegmatite dyke with a 22 m interval of 1.05% Li2O.
Cross-section illustrating YLP-0199 with results as shown in the Fi Southwest pegmatite dyke with a 22 m interval of 1.05% Li2O.

Figure 4

Plan view showing the surface expression of the Nite pegmatite with diamond drill holes reported in this press release.
Plan view showing the surface expression of the Nite pegmatite with diamond drill holes reported in this press release.

Figure 5

Cross-section of YLP-0195 which intersected the Nite pegmatite dyke with a 15 m interval of 1.00% Li2O.
Cross-section of YLP-0195 which intersected the Nite pegmatite dyke with a 15 m interval of 1.00% Li2O.

Figure 6

Plan view showing the surface expression of the BIG West pegmatite with diamond drill holes reported in this press release.
Plan view showing the surface expression of the BIG West pegmatite with diamond drill holes reported in this press release.

Figure 7

Cross-section of YLP-0191 which intersected the BIG West pegmatite dyke with a 11 m interval of 0.74% Li2O.
Cross-section of YLP-0191 which intersected the BIG West pegmatite dyke with a 11 m interval of 0.74% Li2O.

Figure 8

Plan view showing the surface expression of the Fi Boye pegmatite with diamond drill holes reported in this press release.
Plan view showing the surface expression of the Fi Boye pegmatite with diamond drill holes reported in this press release.

VANCOUVER, British Columbia, Feb. 27, 2024 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 8 drill holes completed at the Fi Southwest, BIG West, Nite, & Fi Boye pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling intersected significant intervals of spodumene mineralization, with the following highlights:   

Highlights:

  • YLP-0199: 22 m at 1.05% Li2O, (Fi Southwest) 
    including: 9 m at 1.87% Li2O

  • YLP-0195: 15 m at 1.0% Li2O, (Nite)
    including: 2 m at 1.42% Li2O
    and including: 8 m at 1.26% Li2O

  • YLP-0189: 4 m at 1.11% Li2O, (Fi Boye)

Discussion of Results

This week’s drill results are from 1,325 m drilled across eight holes, including the first hole of the 2024 winter program at Fi Southwest as well as 2023 results from the Nite, BIG West, and Fi Boye pegmatites. A table of composite calculations, general comments related to this discussion, and a table of collar headers are provided towards the end of this section.

David Smithson, SVP, Geology of LIFT comments, “Results from the deep drilling at Nite this week continue to impress with hole 195 intercepting 15 m at 1.0% Li2O at 250 m from the surface. This is the second deep hole we have drilled on the Nite structure following on from 10 m at 1.4% Li2O drilled at the same level in 2023. The Fi Southwest dyke was similarly impressive this week returning 22 m at 1.0% Li2O near to the surface. Drilling to date on the Fi Southwest dyke has defined over 900 m of good shallow mineralization so we are very excited to test the rest of the structure to depth in the 2024 drill program currently underway in the field.”

Li-FT  yellowknife pegmatites Jan 2024
Li-FT yellowknife pegmatites Jan 2024


Figure 1 – Location of LIFT’s Yellowknife Lithium Project. Drilling has been thus far focused on the Near Field Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group.

The Fi-SW dyke strikes over at least 1.1 km on surface with an average outcropping width of approximately 20 m. The dyke dips between 60°-80° to the east-southeast and trends towards the north-northeast. Drilling of Fi SW shows that it ranges from a single 20-40 m wide dyke to 2-3 dykes of similar cumulative width within a 50-70 m wide corridor.

YLP-0199 is the first hole drilled in the 2024 winter program and was collared to test the Fi SW pegmatite approximately 150 m from its northern mapped extent and 50 m beneath the surface. Drilling intersected 4 m and 15 m wide pegmatites separated by 3 m of country rock with assays returning a wall-to-wall composite of 1.05% Li2O over 22 m that includes 9 m of 1.87% Li2O (Table 1 & 2, Figures 2 & 3).